Imran Hassan Bhatti
Project management & Supply Chain Professional
Lahore
Summary of Career
1. • Leading the Power plant section, responsible for the mechanical installation and erection of combined cycle power plant, including , gas turbine, steam turbine and its auxillaries, heat recovery generators and Balance of Plant
2. Preparation and update of erection and installation, planning schedule, procedures and strategies for mechanical equipment within the area of responsibility
3. Procurement of initial spares, capital spares & strategic spares of the plant.
4. • Development and implementation of the plant performance plan and efficiency improvement program.
5. • Monitor and evaluate plan performance & initiates corrective action to reduce the cost and to increase the plant performance.
6. • Monitor and review the all monthly reports related to service agreements as called for in the Power Purchase Agreement (PPA), Fuel Supply Agreement (FSA), LTSA (Long term service agreement.
7. • Planning of the plant, procurement of required spares, hiring of OEM Expat Services for critical activities, outsource additional manpower, execution of all activates as per planning, monitoring and super vision of all activities and preparation of final report of plant.
8. Key role in the management of the O&M agreement with the Owner, especially the generation and the follow up of punch lists and warranty issues.
9. Coordinate plant improvement projects with finance and accounting, administration, operation and HSE departments
10. Define ,manage and monitor the maintenance budget in line with the overall Plant budget
Experience as Sr.Engineer Mechanical
Century Paper & Board mills Limited Pakistan
15 June 2000
17 April 2007
• Planning of Project, Procurement of material, Contractor management and Piping erection of the First phase of BSPM Plant including ( PM6, Power plant. utilities & SPP)
• Reviewing supplier drawings (Erma and DEL ) for compliance with what Packages have purchased;
• Worked as a Sr. Engineer on 43 MW Power House in Packages.
• Determining any missing design information required to complete the detailed design of equipment and piping installation details;
• Establishing/reviewing overall piping layout concept;
• Completing the equipment and piping layout details required for equipment and piping installation by a contractor
• Implementing design standards selected for the mill design
• Ensuring that mechanical and piping design is being done in accordance with the project design standards
• Planning, supervision, and execution of maintenance and installation of Steam turbines, lube oil pumps, feedwater pumps, and soot blowers.
• Ensure that maintenance technicians are adequately trained, equipped, and motivated so that the maintenance program can be accomplished in a safe, timely, and cost-effective manner.
• Maintains and updates operating and training manuals for the maintenance department
Experience as Project Manager Power Plant
Descon
19 September 2007
31 December 2011
Responsible for the installation and pre-commissioning activities of the Steam turbine (GE Novo Pignone, SC Series 78MW)
• Commissioning & start-up of 2 boilers (HRSGs) each having capacity of 112 tons/hr steam including HP & LP steam bypass system (CCI Valves) & Vent systems
The focal point for the commissioning activities for 02 GE Frame 6 Gas Turbines
Coordinate with GE Technical Advisor for installation of GTs and auxiliaries as per GE drawings
• Commissioning & start-up of all BOP systems e.g. Gas conditioning; Liquid Fuel storage & supply to GTGs; Firewater(FW); Cooling water as well as Aux cooling water systems involving Piping networks, pumps & accessories
• Project Manager in the initiation of the performance test run (guarantee test run) based on contractual requirements
Involved in design of equipment and piping general arrangement drawings as per P&IDs
• Review Piping plan, isometrics, supports details, equipment location plans, plot plans, orientation drawing, Tie-in Index & tie-in packages.
The focal point for the installation of an Electric generator package including lube oil and cooling system.
132 KVA grid station from ABB, installation coordination with ABB representatives for timely completion.
• Review all vendor documentation to assure compliance with the design and technical requirements
Experience as Sr. Engineer Maintenance
SABIC
17 January 2012
09 April 2016
Shutdown Planning and preparation for spares/consumables/tools required for SAFCO-2-3 & 4 TA.
Following equipment was in my area of responsibility.
1. Natural Gas Compressor & Steam Turbine (
2. Syngas Compressor low pressure & High pressure & Steam turbine
3. Air compressor & Steam Turbine
4. Refringent compressor & Steam Turbine
5. CO2 Compressor & Steam Turbine.
6. Utility Equipment including Fire protection Pumps & tanks, Boilers, Instrument air, and Plant air system
• Responsible to co-ordinate with EDMS specialist to update all drawings, datasheets, specification & technical documentation including test certificates and inspection reports of supplied equipment in EDMS (Electronic Data Management System).
• Technical evaluation of all mechanical stock items to be procured.
• Follow up and update spares for bad actors of all plants.
• Review SPIR (Spare parts and interchangeability records) for all Functional Locations installed.
• Provide maintenance material support to daily planning, TA team, and execution team.
• Monitoring and analysis of the cost of generation, review, and evaluation of plant equipment operating efficiency and test requirements.
Experience as Head Supply Chain and Head Project Management
DESCON LMW, Pakistan
01 July 2016
19 March 2021
• Leading the Power plant section, responsible for the mechanical installation and erection of combined cycle power plant, including , gas turbine, steam turbine and its axillaries, heat recovery generators and Balance of Plant
• Preparation and update of erection and installation, planning schedule, procedures and strategies for mechanical equipment within the area of responsibility.
• Procurement of initial spares, capital spares & strategic spares of the plant.
• Preparation of the punch list items of the GTs, HRSG, ST & BOP.
• Review of design documents, P&IDs, FAT & Commissioning documents.
• Initiating and tracking warranty claims of the plant.
• Managing contract issues with GE from Customer side, versatile knowledge of contract management.
• Managing steam turbines, gas turbines and HRSG maintenance and as per OEM recommendations.
Master 30 June 2007
MSC Engineering Management from UET LahoreBachelor 30 June 2000
BSC Mechanical engineer from UET Taxila