Simon Osude
Electrical Engineer
Port Harcourt
Summary of Career
1. Adept at PLC, HMI, and SCADA programming with Siemens TIA Portal and Allen Bradley RSLogix 500
2. Performed Electrical circuit design and Installation of Generator Sets, Electric Motor, LV Switchgear, Automated Industrial Fuel Filtration plants and Field devices Complying with electrical regulations and standards.
3. Installation of Generator Sets, Electric Motor, LV Switchgear, Automated Industrial Fuel Filtration plants and Field Device.
4. Collaborate with team to successfully develop a PLC program in Ladder diagram using Siemens TIA Portal to automate industrial fuel filtration plant for cleaning and de-watering of multiple underground bulk fuel storage facilities.
5. Debugged PLC program and improved PID control logic of originally written programs and documented it properly for future references.
6. Planned and executed cleaning and re-calibration of both surface and underground industrial bulk fuel storage equipment
7. Collaborate with team to Carried out the design and installation of 11KV distribution lines and 750KVA Step down transformer as an alternative source of power supply for the University Teaching Hospital.
8. installed Power system Equipment including MV/LV Panel, Generator sets and industrial UPS
9. Carried out Site Inspection, planning, electrical design, drafting with AutoCAD and wiring of medical structures
10. Collaborate with team to successfully design and install power supply requirement for a 64 slide CT scan machine which includes a 250KVA dedicated generator set and a 160KVA UPS as a backup power supply.
Experience as Field Engineer (Electrical Engineer/Automation Technician/Instrumentation Technician)
03 August 2015
To date
Carried out Electrical Circuit design, installation, and preventive maintenance of Industrial Plants, generator sets, Electric Motors, PLC, I/O modules, field devices, and Telemetry Systems. Planned and executed cleaning and re-calibration of both surface and underground industrial bulk fuel storage equipment.
•Electrical Circuit design and Installation: Performed Electrical circuit design and Installation of Generator Sets, Electric Motor, LV Switchgear, Automated Industrial Fuel Filtration plants, and Field devices Complying with electrical regulations and standards.
•PLC Programming and Documentation: Collaborate with team to successfully develop a PLC program in Ladder diagram using Siemens TIA Portal to automate industrial fuel filtration plant for cleaning and de-watering of multiple underground bulk fuel storage facilities.
•Execute PLC program debugging and control loop modifications and correction: Debugged
PLC program and improved PID control logic of originally written programs and documented it properly for future references. Carried out intricate reprogramming sensors of telemetry which boosted the system accuracy and cultivated client satisfaction.
•Execute preventive maintenance works: Successfully Repaired and maintained plant electrical systems including but not limited to electric Motor, PLC, Electronic Flow control valves, and other field devices (e.g., Temperature, Pressure, and Level gauges).
•Working Cross-‐functionally and in Teams: Led team to facilitate the successful and timely completion of a complex bulk Fuel Storage tank cleaning and re-calibration project; completed the task without the downtime and within approximately two-thirds of the time originally estimated.
Experience as Electrical Maintenance Engineer
01 June 2012
06 July 2013
Carried out electrical design and wiring of medical structures. Collaborate with team to inspect site, plan, design, draft with AutoCAD, and installed Power system Equipment including MV/LV Panel, Generator sets, and industrial UPS, etc.
Key Accomplishments:
●Collaborate with team to successfully design and install power supply requirement for a 64 slide CT scan machine which includes a 250KVA dedicated generator set and a 160KVA UPS as a backup power supply.
●Performed installation of Hi-Tech Protection Panel to synchronize two 500KVA generator sets.
●Collaborate with team to Carried out the design and installation of 11KV distribution lines and 750KVA Step down transformer as an alternative source of power supply for the University Teaching Hospital.
Bachelor 04 November 2011
Bachelor of Technology in Electrical/Electronic Engineering, Rivers State University of Science and Technology, Port Harcourt, Nigeria.Master 18 November 2020
Master of Technology in Power Engineering, Rivers State University, Port Harcourt, Nigeria.