Muhammad Waseem Irshad
Mechanical
Muscat
Summary of Career
Experience as
27 June 2011
31 January 2014
? Assistant Manager Operation & Development at RAVI Autos Private Limited, Lahore, Pakistan.
27 June, 2011 till 31 Jan, 2014
• Efficiently using techniques such as Time and Motion study, PERT/CPM, 5S, KAIZEN to enhance productivity and ease in process flow, Productivity Analysis & suggesting Improvements.
• Managed the design and development of parts at customer premises and got the job done to meet the production deadlines. Assure that manufacturing of products is according to standards.
• Take effectively corrective and preventive measures against non-conformities observed during production processes and to ensure that they should not reoccur.
• Reverse Engineering of products, Developed 2D & 3D drawings on AUTO CAD & PRO E soft wares, Inspection of components on 3D CMM.
• Successfully completed 200 KAIZEN activities Project in one month.
• Implementation and monitoring of Plant Maintenance of machines, utilities, allied equipment. Prepare & review the maintenance schedule of machines & equipment.
• Spares management activities starting from technical review of requirements. Monitor installation and commissioning of new plant, machinery and facility.
• Development of projects plan and subsequently conferring with the management
Experience as
03 February 2014
28 February 2017
? Assistant Manager QHSE at KSB Pumps Company Limited Pakistan.
03 Feb, 2014 till 28 Feb, 2017
• Formulation, establishment and implementation of IMS (Integrated Management System) companywide related to ISO 9001:2015, ISO 14001-2015, and BS OHSAS 18001-2007.
• Developing Quality policies, manual and Standard Operating Procedure/ Work Instructions related to IMS, implementing companywide and verifying compliance throughout the organization by conducting regular audits.
• Assuring the Quality of whole Product line, developing QA/QC Plans, against the defined procedures and applicable International standards (DIN, ASTM standards).
• Conducting all kinds of audits internal/ external of all departments, identifying diversities, finding root cause with departmental heads and establishing effective Corrective Actions to avoid recurrences.
• Comprehensive technical report writing (using statistical tools i.e. Pareto/ Pie charts, Histogram, Fish bone diagram ), analyzing trends, identifying issues, presenting to top management, taking necessary corrective actions and assuring compliance.
• Devising strategies to implement continual improvement processes with the concepts of Total Quality Management, 5S, KAIZEN.
• Identifying weak areas companywide & conducting trainings related to QA/ QC, IMS & monitoring the effectiveness of trainings.
• Hands on experience in SAP-ERP QM Module.
Experience as
06 March 2017
20 August 2017
? Overall Transmission Project Engineer
Al Mansoor International Co. LLC – Oman.
06 Mar, 2017 – till date.
• Coordinating project management activities, resources, equipment and information, Monitor and track project progress and handle any issues that arise
• Liaise with clients to identify and define project requirements, scope and objectives and make certain that client objectives are met.
• prepare project proposals, timeframes, schedule and budget
• Act as the point of contact and communicate project status adequately to all participants
• Use project management tools to monitor working hours, budget, plans and money spend, Create and maintain comprehensive project documentation, plans and report
• Issue all appropriate legal paperwork, Report and escalate to management as needed
• Monitoring the Mechanical scope of work like onsite inspections of pumps, valves and all utilities for their effective performance.
• Responsible for establishing and implementing QMS (Quality Management System) related to ISO 9001:2015.
• Working with all concerned departments to establish corrective actions against non-conformities related to process and product and their follow ups.
Bachelor 16 June 2011
BSc Mechanical Engineering with Specialization in Industrial and Manufacturing Engineering CGPA 3.276Intermediate 31 July 2007
HSSC Pre EngineeringMatric 31 July 2005
SSC Sceince