muhammad Azeem Amir

Electrical Engineer
Jeddah


Profile Views 192

Recommendations (0)

Skills
MS Project MS Word MS Excel MS Power Point Interface Management System SAP
  • Experience
    12
  • U.A.E Experience
    --
  • Industry
    Oil , Gas & Energy
  • Nationality
    Pakistan
  • Visa status
    ---
  • Qualification
    Bachelor - BSc. Electrical Engineering from University College of Engineering & Technology Bahauddin Zakariya University Multan Pakistan.
  • Driving License: Saudi Arabia, Pakistan
Other Matching Titles/Position
Industry Titles
Oil , Gas & Energy

Summary of Career

Work Experience (Employment History)

Experience as

  • Employer

  • From

    15 February 2005

  • To

    31 March 2007

  • Detail

    Worked at BCL Plant as Instrument Engineer Maintenance for their Cement Plant Line-1&2 projects.

Experience as

  • Employer

  • From

    02 April 2007

  • To

    28 February 2008

  • Detail

    Worked at WAPDA (A Government Owned Water & Power Development Authority)
    as an Electrical Engineer at 20 MW Rasul & 1000 MW Mangla Hydel Power Generation Plant.

Experience as

  • Employer

  • From

    29 March 2008

  • To

    25 February 2011

  • Detail

    Ø EPIC for the Up-gradation of Marine Loading arm at Berth#6, QP refinery, Mesaieed.
    Ø EPIC to replace F&G system at NGL - 2 storage & loading plant, mesaieed.
    Ø EPIC for replacement of heavy motors at QP refinery, mesaieed.
    Ø Flare Gas Measurement System Upgrade Project. Qatar Gas-1.
    Ø QG Major Shut down 2009 & 2010.
    Ø Qatar National Cement Company 5000 (4) TPD, Cement Plant. New Plant Construction & Shut down Work. With FCB Cement Co., (France) main Contractor.
    Ø Installation & commissioning of Analyzer at QG.

    DUTIES & RESPONSIBILITIES:

    Ø Planned the execution phase of project, organizing schedule of activities from engineering and procurement to construction.
    Ø Prepare the material submittals, technical submittals, QC procedures, ITP, calibration procedure & loop folders. Preparation of method statement, JSA documents & responsible for resolving quality related issues in site as per approved procedures.
    Ø Inspection of equipment's, Instrument sensors/Transmitter & material, cable, conduit, tray & tray accessories & tubing accessories to be used & installed as per client specifications & quality manual.
    Ø Review & verify drawings/details as per SOW including single line diagrams. Preparation of material approval request to submit to client for different materials & equipment's.
    Ø Review project scope, contractual agreement & documents for the project assurance & safety concerning contractual matters.
    Ø Coordinate & attend weekly progress meeting. Attend the weekly QA/QC & Pre-commissioning & Commissioning meetings.
    Ø Response to control the field design change, technical queries & follow project standard / specification. Familiar to international codes & standards, IEC, NEC, NEMA & IEEE.
    Ø Planning of materials, scheduling & man hours for job execution.
    Ø Coordinate with operation department for PTW/Isolation, planning department, purchase/material department, store, workshop & contractors (maintenance) & other supports.

Experience as

  • Employer

  • From

    22 April 2011

  • To

    31 July 2012

  • Detail

    Being an integral part of SAMREF Refinery, worked in PPC Department as Project Engineer – E&I (PPC),

    Ø Own and complies with the SAMREF`s policies.
    Ø Preparation of daily progress report & update immediate supervisor.
    Ø Planning, coordination & execution of all site modification work.
    Ø Interface & coordinate among client, technical department & contractors to complete the projects in time & under given span successfully.
    Ø Materials & resource requirement planning and follow-up with the procurement, expedition department and ware house for the in time delivery.
    Ø Review and comment on all project engineering packages prepared by Technical Department and Engineering Contractor.
    Ø Conduct weekly, monthly & coordination meeting to expedite site progress.
    Ø Review and recommendations on contractor's proposed schedule.
    Ø Contractor progress monitoring, verification, performance analysis and earned value analysis based on the established systems.
    Ø Responsible to verify contractor invoices for work completion before final approval for payments.

Experience as

  • Employer

  • From

    01 August 2012

  • To

    31 December 2014

  • Detail

    Worked at YASREF Refinery with ABV Rock Group.

    Ø Responsible for reviewing design drawings & involved with CAD Micro-Station & Network engineer (for power, copper & Fibre cable system) for the development, Installation details, schematics, one lines, network diagrams, input/output schedule & other drawings for YASREF refinery project.
    Ø Involved in Engineering Interfaces to verify the design of structure cables of Process Automation System, communication system, PA/GA paging system, Fire alarm system, SACS (security access & control), Electrical Power system, Data Center-Telecom Equipment Room & ISP/OSP cable network layout diagrams.
    Ø Involved in construction interfaces to carry out site supervision of site works & resolved technical issues related to design conflicts & scope issues. Attended meetings & gave presentations to the clients & other package contractors.
    Ø Preparation of weekly Construction Interfaces schedule according to activities & priorities.
    Ø Preparation of weekly IMS highlights for Construction Interfaces & Engineering Interfaces.
    Ø Responsible for monitoring of all integration and interface issues.
    Ø Responsible for monitoring the timely interface issues resolution during the engineering / construction and handover phase of the project.
    Ø Act as the focal point for any major issue of competing priority or technical compatibility, coordinating resolution up to the required level.
    Ø Act as the central point of contact between Contractors to ensure interface issues are communicated to the relevant parties.

Experience as

  • Employer

  • From

    04 January 2015

  • To

    09 September 2017

  • Detail

    Worked at SAMREF Refinery through DAR Al-Riyadh as “Project Engineer E&I”.

    Ø Responsible to handle Capital & expense projects.
    Ø Development of Scope of work.
    Ø Preparation of cost estimate based on developed SOW & FEED package.
    Ø Working on SAP for planning of Funds, PR, P.O, material etc.
    Ø Preparation of review & final construction package.
    Ø Selection of project material like MOV's, Transmitters, sensors, Radar Level transmitters, C.B, Cables etc.
    Ø Preparation of Purchase request & review of Quotation for final P.O.
    Ø Follow-up & monitoring of execution of project from start to successful completion of project.
    Ø Leading all project related meetings, PMT, PSSR, Kick-off, SHE review & ISHE review meetings.
    Ø Preparation of project schedule to maintain projects progress.
    Ø Supervision of project phases & vendor commissioning activities.
    Ø Responsible to approve all contractor, sub-contractor, vendor & vendor engineer invoices.
    Ø As built drawings & project closure.

Experience as

  • Employer

  • From

    02 November 2015

  • To

    30 April 2017

  • Detail

    Being integral part of SMC-ESER worked at Multan Metro Bus Project.

    Ø Responsible to work at 27 km long Metro bus project which includes 07 stations in scope.
    Ø Responsible to monitor work progress of all stations and execute construction work.
    Ø Responsible to assist with resolution of engineering problems and provides technical guidance by carrying out investigations, evaluating solutions and writing recommendations.
    Ø Carryout all conduit work for electrical cabling before casting of concrete.
    Ø Coordination with Civil & Mechanical department to execute the work in proper way.
    Ø Installation of power cables, Junction boxes, Instrument boxes, lamp poles & Genset at all stations.
    Ø Inspection of cable, conduit, tray & tray accessories to be used & installed as per client specifications & quality manual.
    Ø Review & verify drawings/details as per SOW including single line diagrams.

Experience as

  • Employer

  • From

    16 August 2017

  • To

    31 December 2017

  • Detail

    Worked at Petro Rabigh Refining & Chemical through Berkeley Al-Ghrimeel Engineering as Project Engineer.

    Ø Preparation of WBS & Progress Measurement Plan for PMC and Overall Project
    Ø Progress updating & reporting / Project scheduling
    Ø Detail design IFC package review
    Ø Stage & secure materials
    Ø Consolidate document package for cataloging
    Ø Shut Down Plan/Preparedness
    Ø Job Card Verification / QA/QC (Field)
    Ø Monitor & confirm compliance with all PRC safety requirements
    Ø Change Orders / Technical Queries and Clarifications
    Ø Construction Progress Monitoring & Coordination
    Ø Construction Progress Meetings (PRC, PMC, Contractor)
    Ø Third Party Coordination
    Ø Pre-Commissioning/Commissioning
    Ø Punch listing / Mechanical Completion Certificate
    Ø Verify Red Line Drawings / Final As-Built Drawings
    Ø Prepare Project Record Books / Capital Assets submission

Academic Qualification

Bachelor 11 November 2005

BSc. Electrical Engineering

Bachelor 11 November 2005

BSc. Electrical Engineering from University College of Engineering & Technology Bahauddin Zakariya University Multan Pakistan.
Certifications
Recommend muhammad Azeem Amir
Related UserList of Members
Mentor
Not yet Assigned
Profile Answers
Related Professionals
Profession: Network Engineer
Current City: Karachi

Profession:
Current City:

Profession: Safety officer / Safety fields
Current City: Nagpur

Profession: QHSE
Current City: Jeddah

Profession: Logistics supervisor
Current City: Barmer Rajasthan

Profession: Process/Operation/Safety/Chemical Engineer
Current City: Abu Dhabi