15 February 2005
31 March 2007
Worked at BCL Plant as Instrument Engineer Maintenance for their Cement Plant Line-1&2 projects.
Experience as
02 April 2007
28 February 2008
Worked at WAPDA (A Government Owned Water & Power Development Authority)
as an Electrical Engineer at 20 MW Rasul & 1000 MW Mangla Hydel Power Generation Plant.
Experience as
29 March 2008
25 February 2011
Ø EPIC for the Up-gradation of Marine Loading arm at Berth#6, QP refinery, Mesaieed.
Ø EPIC to replace F&G system at NGL - 2 storage & loading plant, mesaieed.
Ø EPIC for replacement of heavy motors at QP refinery, mesaieed.
Ø Flare Gas Measurement System Upgrade Project. Qatar Gas-1.
Ø QG Major Shut down 2009 & 2010.
Ø Qatar National Cement Company 5000 (4) TPD, Cement Plant. New Plant Construction & Shut down Work. With FCB Cement Co., (France) main Contractor.
Ø Installation & commissioning of Analyzer at QG.
DUTIES & RESPONSIBILITIES:
Ø Planned the execution phase of project, organizing schedule of activities from engineering and procurement to construction.
Ø Prepare the material submittals, technical submittals, QC procedures, ITP, calibration procedure & loop folders. Preparation of method statement, JSA documents & responsible for resolving quality related issues in site as per approved procedures.
Ø Inspection of equipment's, Instrument sensors/Transmitter & material, cable, conduit, tray & tray accessories & tubing accessories to be used & installed as per client specifications & quality manual.
Ø Review & verify drawings/details as per SOW including single line diagrams. Preparation of material approval request to submit to client for different materials & equipment's.
Ø Review project scope, contractual agreement & documents for the project assurance & safety concerning contractual matters.
Ø Coordinate & attend weekly progress meeting. Attend the weekly QA/QC & Pre-commissioning & Commissioning meetings.
Ø Response to control the field design change, technical queries & follow project standard / specification. Familiar to international codes & standards, IEC, NEC, NEMA & IEEE.
Ø Planning of materials, scheduling & man hours for job execution.
Ø Coordinate with operation department for PTW/Isolation, planning department, purchase/material department, store, workshop & contractors (maintenance) & other supports.
Experience as
22 April 2011
31 July 2012
Being an integral part of SAMREF Refinery, worked in PPC Department as Project Engineer – E&I (PPC),
Ø Own and complies with the SAMREF`s policies.
Ø Preparation of daily progress report & update immediate supervisor.
Ø Planning, coordination & execution of all site modification work.
Ø Interface & coordinate among client, technical department & contractors to complete the projects in time & under given span successfully.
Ø Materials & resource requirement planning and follow-up with the procurement, expedition department and ware house for the in time delivery.
Ø Review and comment on all project engineering packages prepared by Technical Department and Engineering Contractor.
Ø Conduct weekly, monthly & coordination meeting to expedite site progress.
Ø Review and recommendations on contractor's proposed schedule.
Ø Contractor progress monitoring, verification, performance analysis and earned value analysis based on the established systems.
Ø Responsible to verify contractor invoices for work completion before final approval for payments.
Experience as
01 August 2012
31 December 2014
Worked at YASREF Refinery with ABV Rock Group.
Ø Responsible for reviewing design drawings & involved with CAD Micro-Station & Network engineer (for power, copper & Fibre cable system) for the development, Installation details, schematics, one lines, network diagrams, input/output schedule & other drawings for YASREF refinery project.
Ø Involved in Engineering Interfaces to verify the design of structure cables of Process Automation System, communication system, PA/GA paging system, Fire alarm system, SACS (security access & control), Electrical Power system, Data Center-Telecom Equipment Room & ISP/OSP cable network layout diagrams.
Ø Involved in construction interfaces to carry out site supervision of site works & resolved technical issues related to design conflicts & scope issues. Attended meetings & gave presentations to the clients & other package contractors.
Ø Preparation of weekly Construction Interfaces schedule according to activities & priorities.
Ø Preparation of weekly IMS highlights for Construction Interfaces & Engineering Interfaces.
Ø Responsible for monitoring of all integration and interface issues.
Ø Responsible for monitoring the timely interface issues resolution during the engineering / construction and handover phase of the project.
Ø Act as the focal point for any major issue of competing priority or technical compatibility, coordinating resolution up to the required level.
Ø Act as the central point of contact between Contractors to ensure interface issues are communicated to the relevant parties.
Experience as
04 January 2015
09 September 2017
Worked at SAMREF Refinery through DAR Al-Riyadh as “Project Engineer E&I”.
Ø Responsible to handle Capital & expense projects.
Ø Development of Scope of work.
Ø Preparation of cost estimate based on developed SOW & FEED package.
Ø Working on SAP for planning of Funds, PR, P.O, material etc.
Ø Preparation of review & final construction package.
Ø Selection of project material like MOV's, Transmitters, sensors, Radar Level transmitters, C.B, Cables etc.
Ø Preparation of Purchase request & review of Quotation for final P.O.
Ø Follow-up & monitoring of execution of project from start to successful completion of project.
Ø Leading all project related meetings, PMT, PSSR, Kick-off, SHE review & ISHE review meetings.
Ø Preparation of project schedule to maintain projects progress.
Ø Supervision of project phases & vendor commissioning activities.
Ø Responsible to approve all contractor, sub-contractor, vendor & vendor engineer invoices.
Ø As built drawings & project closure.
Experience as
02 November 2015
30 April 2017
Being integral part of SMC-ESER worked at Multan Metro Bus Project.
Ø Responsible to work at 27 km long Metro bus project which includes 07 stations in scope.
Ø Responsible to monitor work progress of all stations and execute construction work.
Ø Responsible to assist with resolution of engineering problems and provides technical guidance by carrying out investigations, evaluating solutions and writing recommendations.
Ø Carryout all conduit work for electrical cabling before casting of concrete.
Ø Coordination with Civil & Mechanical department to execute the work in proper way.
Ø Installation of power cables, Junction boxes, Instrument boxes, lamp poles & Genset at all stations.
Ø Inspection of cable, conduit, tray & tray accessories to be used & installed as per client specifications & quality manual.
Ø Review & verify drawings/details as per SOW including single line diagrams.
Experience as
16 August 2017
31 December 2017
Worked at Petro Rabigh Refining & Chemical through Berkeley Al-Ghrimeel Engineering as Project Engineer.
Ø Preparation of WBS & Progress Measurement Plan for PMC and Overall Project
Ø Progress updating & reporting / Project scheduling
Ø Detail design IFC package review
Ø Stage & secure materials
Ø Consolidate document package for cataloging
Ø Shut Down Plan/Preparedness
Ø Job Card Verification / QA/QC (Field)
Ø Monitor & confirm compliance with all PRC safety requirements
Ø Change Orders / Technical Queries and Clarifications
Ø Construction Progress Monitoring & Coordination
Ø Construction Progress Meetings (PRC, PMC, Contractor)
Ø Third Party Coordination
Ø Pre-Commissioning/Commissioning
Ø Punch listing / Mechanical Completion Certificate
Ø Verify Red Line Drawings / Final As-Built Drawings
Ø Prepare Project Record Books / Capital Assets submission
Bachelor 11 November 2005