Sanad Samir
Project Electrical and Instrument
Alexandria
Summary of Career
1. Sr. Level Project Consultant with expertise in both EPC firms and as an Owner Representative Managed the E&I activity to meet the required project schedule from the detailed design phase through project execution, completion and hand-over to Field Operations Group.
2. Carried out the construction works by the Contractors & vendors, ensuring that the time, cost, quality, safety and environment requirements of construction activities are met. To satisfy the contractual obligations and targets fixed by the project Manager
3. Academically astute, with a proven track record for excellence, resourcefulness, and initiative and dynamic leadership, successfully executed key positions of multifarious nature and capacities during a long stint of career. Being a focused, motivated and goal-oriented professional, I have consistently proven my ability to handle operational and strategic levels of multiple responsibilities in crisis and pressure, while operating under rigorous deadlines.
4. With an innate sense of task prioritization, managerial aptitude and result-oriented attitude towards accelerating organizational growth and that too in a high pressured, time-bound and competitive environment, I reckon that my grooming level is apt to look outward for a challenging middle-level position, requiring complete grasp & grip of Engineering and high level of professional loyalty, integrity, and maturity.
5. A glance through my resume, attached along, shall familiarize you with my credentials. I am confident of fitting in the slot as well as on the team. However, should you desire personal interaction; I may be called upon where the possibility of our association could be explored further.
6. Diligent and result-oriented professional with +15 years of overall experience; expertise in the field of Engineering in the spectrum of Project QA/QC E&I Field assistant manager and Project E&I Engineer at Khalda Petroleum Company (Apache) and Sr. QA/QC E&I Engineer at Yemen SAFER & Total /YLNG plant as well as QA/QC E&I Engineer at CCC GTL Shell/Qatar Gas production facilities. Also, I had the position of Electrical Engineer at Samsung Engineering Egypt and Instrumentations, Electrical Design/
7. Demonstrated history of successful independently handling the Project Inspection, Quality Audit and controlling the Projects as per schedule.
8. Versatile leader, capable to take up management job with the overall responsibilities of controlling the inspector's team/workforce under one distinguished umbrella.
9. Expertise in reviewing all types of drawing and guiding the subordinates in accordance; well versed with process recruitment to get the skilled manpower for smooth execution of the project.
10. Recognized as a hands-on, proactive individual who can rapidly identify problems, formulate tactical plans, initiate change and implement effective strategies in challenging environments; instruct the subordinates technically and administratively to get the maximum out of them by making them quality and safety aware.
Experience as Project Electrical and Instrument Field Engineer
08 May 2017
18 April 2020
The West Nile Delta (WND)
Responsible for ensuring the requirements of the procedure are properly implemented, quantity
Takeoffs, quantity tracking, field material requisitions, knowledge of job scope, technical issue
Resolution, work package development, field changes, configuration control, temporary utility support,
and quality verification by means of inspection, testing, and non-conformance reporting and control for
the following
- Power and control: Including Generators, Transformers, Distribution Switchgears, Motors Cables
- Bus Duct, Rectifiers, Batteries, AC/DC UPSs, Variable speed drives, Control Panels, and PMS.
- Raceway, cable, and wiring tracking system used throughout the life of a facility
- Installation for both design and field control of electrical raceway, cable, equipment, terminations
- The job also includes commodities generally associated with lighting circuits, light fixtures, switches
- Devices, communication systems, security systems, fire detection & notification, and grounding
- Facilitate and formulate Construction Work packs in line with bp the Client’s objective Order
- Provide construction input to estimates as and when required
- Review design documents and provide constructability input to designs
- Produce sequenced Activity data, Test and Inspection Matrices and compile workplaces
- Identify any Specialist Vendor Support, Tools and Equipment required to implement scope
- Liaising with study team lead discipline engineers on developing solutions on FEED Studies
- Interface with Client’s Operations groups as & when necessary
- Taking part in site surveys and generation of reports where required
- Writing of construction / operational section of FEED report
- Formulate Construction Work packs in line with Project procedures for content, and accuracy.
- Assist with construction input to Bid preparation
- Development of Construction field change notice and inspection reports for Bid estimates
- Thorough working knowledge of ITR’s for Mechanical completion & Pre-commissioning activities
- Liaise closely with home office Engineering on all aspects of design and technical data
- Coordinate & carry out required timely Constructability reviews, in line with 3d Model progression
- Ensure the required Constructability Readiness reviews are addressed to suit the work-pack
- Liaise strongly with Supply Chain for materials & equipment deliverables for alignment to schedules
- Coordinate with Project controls on the progress of work order issuance, and completion dates
- Ensure relevant ITR and EX inspection are monitored for accuracy of time recording during Work-pack
- Participate in HSE improvement activities, promoting HSE elements throughout Pack development
- Full working knowledge of other activities in relation to the relevant Piping & Mechanical discipline
Bachelor 05 May 2002
University Egypt Assiout Degree Bachelor Engineering, Field of Study Electrical, Electronic and Communications From 1997 to 2002