Ansari Mohd Ismail Akhtar
Electrical & Electronics Engineer
Abu Dhabi
Summary of Career
1. Responsible for ensuring that all electrical installation work to be executed in accordance with drawing, Company procedures and project requirement.
2. Ensure Safety all levels is adhered at to personnel, equipment’s and environment.
3. Attend the Daily, weekly and monthly meeting during the project.
4. MRIR (Material receiving inspection report) of items before installations
5. Service activities inclusive installation of conduit, circuit wiring, raceway, cable tray, distribution boards, cable laying, earthing system, panel termination, light fixture & switch socket installation.
6. Preparing reports such as DPR, WPR & MPR.
7. In process inspection of all activities and attend all site meeting.
8. Preparation of all quality documents such as method statement, installation checklist, commissioning & testing report.
9. Making the final measurement & bill and as built drawing.
10. Preparing handing over document.
Experience as Project Engineer
06 March 2017
29 February 2020
A B.E in Electrical Engineer having around 3 years of experience in project coordination, Site execution,Technical Submittal, Quality Documentation, As Built Drawing, Client Billing & Handing over document as a Project Engineer.
Responsible for ensuring that all electrical installation work to be executed in accordance with drawing, Company
procedures and project requirement.
Ensure Safety is adhered at all levels to personnel, equipment’s and environment.
Attend the Daily, weekly and monthly meeting during the project.
Preparing material indent as per BOQ (Bill of Quantity) & drawing.
MRIR (Material receiving inspection report) of items before installations.
Service activities inclusive installation of conduit, circuit wiring, raceway, cable tray, distribution boards, cable
laying, earthing system, panel termination, light fixture & switch socket installation.
Preparing reports such as DPR, WPR & MPR.
In process inspection of all activities and attend all site meeting.
Visual inspection & quality audit after completion of all electrical work.
Coordinating the final inspection with Client.
Preparation of all quality documents such as method statement, installation checklist, commissioning & testing
report.
Making the final measurement & bill and as built drawing.
Preparing handing over document.
Bachelor 14 June 2016
B.E – Electrical & Electronics Engineering – (Distinction) – University of Technology of Madhya Pradesh, India (RGPV) - 2016Other 01 March 2013
Diploma – Electrical Engineering – (First Class) – Maharashtra State Board – 2013