KARTHIK C
Senior Electrical Engineer
Ras Al Khaimah
Summary of Career
1. Handling up to 180KW Yaskawa inverter drives.
2. Maintaining 1000KVA catterpiller gensets with Model-3058.
3. Undergoing maintenance of GA75(Atlas capco), & CSD102 (Kaeser) air compressors.
4. SAP data based maintenance & spare part auto consolidate purchase requisition with MRP system.
5. Able to do instrument calibration, ISO document preparation and also Fire safety system.
6. I have good knowledge of AET(area effetive team) & 5S tool, 7 waste (TIMWOOD)
7. Arranging Spare parts and to organize a plan for machinery Maintenance.
8. Conversant with all type of pressure switches and pressure transducers.
9. Know - How to work with automatic transfer system panel (ATS).
10. Familiar with all kind of electro valves and solenoid coils.
Successfully completed Micro Controller Based Project in Maas Tech Company. Security System for Company and Office use. Complete Body Scanning System for our Body Checkup. Robotics for Company and Home use. Successfully Designed and Programed PLC (OMRON) based Project in R.A.K Ceramics. Dust Collector for collecting the dust. Counting the Production of Tiles. We can see how many and how much Square Meter of Tiles per day and we can change different sizes, different modules in ESA Touch Screen. Pallet Stretch Wrapping Machine for packing the pallet. Press continues cycling while Digital printing machine is stop in glazing line for improving the production. Metal detector (Relay logic) for collecting metal pieces from powder. Automatic ON/OFF Glazing line (Relay Logic) for Power Saving.
Experience as Senior Electrical Engineer
RAK CERAMICS PSC
01 March 2008
Dust Collector for collecting the dust.
Counting the Production of Tiles. We can see how many and how much Square Meter of Tiles
per day and we can change different sizes, different modules in ESA Touch Screen.
Pallet Stretch Wrapping Machine for packing the pallet.
Press continues cycling while Digital printing machine is stop in glazing line for improving the
production.
Glazing line (conveyor line) controls are converted from relay logic to plc control for improving
production and quality.
Automatic ON/OFF Glazing line (plc control) for Power Saving.
Automatic Roller Welding Machine.
Recording Glazing lines (conveyor lines) stoppage timings, using cp1l plc.
Metal detector (Relay logic) for collecting metal pieces from powder for improving quality.
Automatic ON/OFF Glazing line (Relay Logic) for Power Saving
Other 31 May 2006
Diploma in Electronics and Communication Engineering