Muhammad Yaqub Ishaq
Telecommunication Engineer
Riyadh
Summary of Career
1. Excellent study of project and determined requirements with Costs (Man Power, Machines, Staff)
2. Developed personnel policies and procedures
3. Coordination & management With 75 Field Teams
4. Followed and improved an overall project implementation methodology
5. Created and maintained customer deployment and interaction reports
6. Managing all Project Steak holders (Technicians, Supervisors, and Labors).
7. Excellent study of project and determined requirements with Costs (Man Power, Machines, Staff)
8. Monitored and reported project progress to customers on regular basis.
9. Identified areas of improvements to enhance system performance and reliability.
10. Handled emergency situations promptly and make escalations to respective teams as needed.
I did the project management online certification from university of Adelaide , Australia
Experience as Radio Network Optimizer/Manager
07 July 2019
26 December 2019
LTE RF Manager
STC Aspiration Project
Huawei Technologies Riyadh, Saudi Arabia
Major Responsibilities:
• Supervised a team of Engineers in design and development of RF circuit systems.
• Understand customer specifications and accordingly design most effective RF circuits.
• Optimization of existing systems to improve performance and capacity.
• Assisted in budget preparation and expense control activities.
• Ensured Engineers follow design guidelines and procedures.
• Ensured to complete the assigned design projects within allotted budget and timelines.
• Allocated workload to team members and provide assistance to them when needed.
• Monitored and reported project progress to customers on regular basis.
• Oversee system installation, maintenance and testing activities.
• Performed root cause analysis of technical problems and provide corrective actions.
• Identified areas of improvements to enhance system performance and reliability.
• Implement cost-reduction initiatives while maintaining system quality and productivity.
• Handled emergency situations promptly and make escalations to respective teams as needed.
• SSV Review & Submission to Customer
• Acceptance from Customer
Experience as Project Management
16 November 2015
20 June 2019
Project Manager
Zain Ignite Phase-II/Zain 5G Project
Al Hoty Stanger Co LTD (Saudi Arabia)
With Huawei Technologies Riyadh, Saudi Arabia
Major Responsibilities:
• Responsible for project scope, schedule, and cost control.
• Ensured successful and timely installations.
• Developed personnel policies and procedures.
• Improved cost control by eliminating needless expenses.
• Recruited and trained installation team
• Coordination & management With 75 Field Teams.
• Developed and executed testing scenarios, testing data, test plans and scripts
• Followed and improved an overall project implementation methodology
• Created and maintained customer deployment and interaction reports
Experience as Team Lead/RF Engineer
15 November 2012
28 October 2015
RF Engineer/Team Leader
Etisalat-PTCL WLL Project
UCE Telecom Solutions Pvt. Ltd
With Huawei Technologies Pakistan (Pvt.) Ltd
Major Responsibilities:
• Has worked on Pilot Pioneer/Genex Assistant/Map info/Nemo/Tems Discovery.
• Had worked on both at IBS sites and outdoor sites for SSV and for special testing.
• Responsible for SSV Testing and Optimization.
• Responsible for Cluster DT and Optimization.
• Handling customer complaint, issue rectification and final recommendation.
• Handling SSV issues like Coverage, Throughput, CSFB, IRAT redirection and Ping delay etc.
• Performed DT logs analysis using Navigator.
• Generated SSV & Cluster Optimization Reports using Navigator.
• Responsible for SSV and Cluster Final approval.
• Perform Drive Test for 3G (CDMA) Services by using Pilot Pioneer.
• Single Site Verification Test (SSV).
• Swap Check Test.
• Speed Check Test.
• Throughput Check Test.
• Handover Check Test.
• Radio Parameters Check.
• Attend customer complains.
• Neighbor Deletion and keep monitoring of HO Performance.
Matric 17 August 2006
Matric with Science subjects. got A+ gradeMatric 14 May 2008
Fsc. Pre Engineering with A+ gradeBachelor 12 September 2012
Telecommunication Engineering