MUHAMMAD NAEEM AKHTAR

Electrical/ Electronics Engineering
Lahore


Profile Views 288

Recommendations (0)
Last Seen: 28 January 2020 7:03 AM

Skills
1- Design Installation and Commissioning of Electrical Power Systems 2- Project Management 3- Project Planning 4- Procurement & Cost Estimations 5- Generator’s Automation 6- Control System Engineering 7- Remote Monitoring 8- TCP/IP based SCADA division co
  • Experience
    8 Years
  • U.A.E Experience
    Fresh
  • Industry
    Engineering
  • Nationality
    Pakistani
  • Visa status
    Not Applicable
  • Qualification
    Bachelor - Degree: B Sc Electrical/Electronics Engineering University: Bahauddin Zakariya University Multan Marks: 920/1250 %age: 74% Division: 1st
  • Driving License: N/A
Other Matching Titles/Position
QA/QC Engineer
MEP Engineer
Facilities Management Operations Engineer
Procurement Engineer
Proposals & Cost Estimation Engineer
Industry Titles
Engineering

Summary of Career

1. Electrical, Communication and Automation Engineer (Project Planning, Project Management & Supervision specialist) a highly competent and proactive Electrical Engineering Professional with an experience of over 8 years


2. Managing Electrical Projects right from their design and planning stage to installation and commissioning with sound technical knowledge & hands on experience of installation and supervision of electrical systems, their technical evaluation and troubleshooting


3. Preparation of project review offers, effective proposals, BOQ’s, technical specifications, Cost calculation & projects cost estimation, scope of the project, reviewing of preliminary data and drawings


4. Develop purchasing and sourcing to develop, implement and drive the procurement strategies in order to manage suppliers to meet objectives related to cost, delivery performance, schedule and quality.


5. Designing of Electrical Power Systems, Generator’s Automation, Control System Engineering, Remote Monitoring, TCP/IP based SCADA division Commissioning, Data Logging and MODBUS Configuration for data retrieving from RS-485 port for BMS systems (Building Management System).


6. Hands on experience on Generators Synchronization & Load Sharing with multiple Generators & Mains Utility, Load Management System, Fuel Management System & Energy Management Systems.


7. Responsible for Corrective & Preventive maintenance of Generators, UPS’s, Rectifiers, STULZ Units, Fire Suppression System Panels, Generators PM, Overhauling of Generators, Generators Fuel Controller, Fuel Consumption, Load variation analysis & Site PM’s supervising & monitoring at Central-A Core Locations.


8. Conduct surveys, supervised the new Installations, Commissioning and Dismantling of traffic free equipments, Designing & Implementation of AC & DC Power Protections & Automatic controls also at Central-A MGW Core Locations.


9. Operation, Maintenance & Troubleshooting of all power equipments in Electrical network and maintain, enhancement & up gradation of the Access Network Operation (Power & Environment Team) for trouble free operation of nationwide equipment of MSCs and BSCs fall in Power & ENV domain.


10. Conduct owner operations and maintenance training sessions on Installations SOP’s, HSE, FSS Panel Operations and delivering the Fire Prevention & Disaster Management Handling SOP on monthly basis.


Work Experience (Employment History)

Experience as Consultant Electrical & ITS Engineer

  • Employer

    China States Construction and Engineering Corporation Limited

  • From

    12 February 2018

  • To

    25 January 2020

  • Detail

    • Currently Working as a Consultant Electrical & ITS (Intelligent Transportation System) Engineer on PKM Multan -Sukkar Motorway Project M-5 Section-2.
    • Acting as the main technical adviser on a construction site between Consultant team (ACC), Chinese team (CSCEC) & Subcontractors team.
    • Managing projects involving transportation-related electronic and electrical engineering concepts, including design plans, construction engineering, ITS planning documents, and systems engineering.
    • Developing conceptual, preliminary, and final project specifications, plans, cost estimates, preparation of reports, proposals, and concepts of operations.
    • High degree of proficiency in utilizing technical knowledge to effectively resolve complex systems engineering problems in accordance with client requirements.
    • Evaluating engineering problems and consulting with technical experts, as necessary, to develop cost effective and robust solutions.
    • Electronic Toll Collection System, Overloading Control System, Advanced Traveler Information Systems includes FM Radio Broadcast, Emergency Call, VMS, Roadside Weather Information & Navigation System.
    • Advanced Traffic management System includes Accident/ Emergency Reporting System and Automatic Incident Detection System, Video Surveillance and Monitoring System (CCTV Cameras on fiber optics).
    • Coordinate with officials of SEPCO & Sindh Energy Department for the Survey of load evaluation and verification, Electric connection, Electric Poles Installation, Transformers placement & LT Panels etc.
    • Design, Installation, Configuration & Commissioning of Generators, Transformers, LT Power Panels, PFI Panels, ATS/AMF Deep Sea PLC UK controls module DSE-6020 for automatic load switching.
    • Installation, Commissioning, Synchronization and Load Sharing of 2 X 200 KVA Prime Power Cummins Generators with DSE-8610 PLC control modules with IP Based on site SCADA System.

Experience as Project Engineer - Electrical

  • Employer

    zkb jv reliable, lahore,Pakistan

  • From

    05 December 2016

  • To

    11 February 2018

  • Detail

    • Worked as a Project Engineer - Electrical on Lahore Orange Line Metro Train Project (LOLMTP).
    • Hands on experience of working in an industrial or large infrastructure projects including design, installation & development, site supervision, site investigation, etc.
    • Well-versed in design standards, specifications and calculations and have extensive experience in the installation & commissioning of electrical fixtures, Generators, Transformers, Power and Control Panels.
    • Overall management of project including works scheduling, resource finalization with project team, monitoring progress of work to ensure timely completion without any cost and time overrun.
    • Plans the execution of all electrical related works and coordinates to mechanical and civil groups.
    • Coordinates with Client & Consultant’s representatives for any site instructions and inspection of works.
    • Ensures that all the works done are in accordance with the approved construction drawings, contract documents, project specifications and all applicable standards whether local, national or international.
    • Interprets construction drawings and studies the contract documents and applicable standards or specifications prior to execution of any jobs.
    • Manages directly and provide engineering & technical supports to all the electrical work groups at site.
    • Submits site daily reports, inspection requests, estimates and all applicable monitoring reports on regular basis or as required and participating in project review meetings for tracking project progress.
    • Review of all drawings and datasheets, check and correct the shop drawings & as-built drawings also.
    • Procurement, lab testing and preparing of material and equipments specifications and bill of quantities.

Experience as Facility Management Operations Engineer

  • Employer

    JAZZ Pakistan

  • From

    01 February 2016

  • To

    30 November 2016

  • Detail

    • Leading All Site Engineers and technical teams for smooth operation of MSC & MGW’s Power & Environment system Operation.
    • Managing Power, Cooling & Environment of Central-A & IT data center locations.
    • Establishment and implementation of Processes to ensure the reliability of the Installed power & ensuring the 100% environmental KPI achievement of Core & IT data centers location.
    • Establishment of annual CapEx requirement for Core & IT data center location in the ambit of Civil Work, HSE, Power & Environment Equipment up gradations and replace to ensure system reliability.
    • To establish working to reduce the Operational Cost and increasing of System reliability.
    • Preparation of Presentations for Management Review meetings & establishment of SOPs for interdepartmental and with other departments coordination.
    • Managing/coordinate with vendor for any Operational requirement within Central-A & IT DC locations.
    • Provision of 2nd level environment support & Preventive & periodic maintenance of all Generators, Rectifiers, UPSs & FSS Panels of core locations and IT data centers of Central-1.
    • Coordination with other departments Energization, Power Planning, Production and Deployment to resolve all type of power, cooling and environment related issues of all the sites of Central-1.
    • Supervised the new installations, Power up & commissioning for Mobilink Warid merger project.
    • Perform the Battery Backup Test of Rectifiers & UPS’s for power up gradation at MGW Core Locations.
    • Supervised the Generators Overhauling activities for Generators up-gradation project.
    • Installation & commissioning of ELTEK Power Supply 72*KW ELTEK Rectifier (Flatpack2 48/3000 HE) and load sharing with 2 battery banks replacement for power up gradation project.
    • Testing of Fire Panel & Smoke Detectors by given artificial smoke to detectors at MGW Core Locations.
    • Installation & commissioning of 46 KW STULZ units for cooling enhancement project.
    • Perform the NE’s redundancy project for dual supply source availability at MGW Core Locations.

Experience as Operation & Maintenance Engineer

  • Employer

    MobiServe Pakistan Limited M.P.L

  • From

    01 September 2015

  • To

    31 January 2016

  • Detail

    • Leading All Site Engineers and technical teams for smooth operation of MSC & MGW’s Power & Environment system Operation.
    • O & M Engineer having hands on experience in Operation and Maintenance to provide reliable service with special emphasis on QoS.
    • Installation, Configuration, Commissioning, Operation, Maintenance, Support & troubleshooting of Perkins, Cummins & Caterpillar (Rating from 100 KVA to 1500 KVA & Series 1300, 2200, 2300etc.
    • Hands on experience on Generator’s control modules Deep Sea Electronics PLC UK, Woodward Gen 2000, Datakom & Comap Intelligen Synch & Load Sharing Control Modules.
    • Operation, Maintenance & Troubleshooting of Rectifiers including Delta, Emerson, Flatpack ELTEK Energy System (48, 72, 96 & 144 KW).
    • Operation, Maintenance & Troubleshooting of UPS APC Silcon, APC Symmetra, Powerware Eaton, Emerson, MGE Galaxy, Chloride 80- NET & Delta UPS’s range from 20 KVA to 250 KVA.
    • Fire Suppression System KILSEN KSE 701-1 Analogue addressable, KILSEN NK703 Conventional.
    • KILSEN NK 706 Conventional extinguishing control panel, KILSEN KAL426 Extinguishing Control Module & CHEETAH FIKE Protection Systems Addressable Control System
    • Alarm Patching activity of Gensets, UPS, Rectifiers and STULZ Units at all C-1 Region MSC & MGW Core Locations C-1.

Experience as Project Engineer

  • Employer

    Hub Engineering

  • From

    01 May 2014

  • To

    31 August 2015

  • Detail

    • Preparation of Electrical documents for the Basic Engineering & feed package for proposals & projects.
    • Design, implement, maintain and improve electrical instruments, equipment, facilities, components, products and systems for commercial, industrial and domestic purposes.
    • Responsible to provide solution to valuable clients for their Generator’s Automation & Utility Controls.
    • Joined training workshops & Seminars on SICES Generator’s Controllers and Synchronizing modules.
    • Prepare effective proposals, presentations, demonstrations and sales toll on business development opportunities for management.
    • Perform procurement engineering evaluation, commercial grade dedication and item equivalency evaluations in support of site operations, maintenance and engineering departments.
    • Provide full support to all bids and proposals and assist in developing global proposal standards and in implementing them and review of new inquiries including scope of works, drawings and specification.
    • Designing Of Electrical Power Systems, Generator’s Automation, Control System Engineering, Remote Monitoring, SCADA division commissioning.
    • Hands on experience on Generator Synchronization & Load Sharing between multiple sources.
    • Load Management System (LMS) to drive multiple Generators according to variation in Load to save Fuel, minimize the maintenance cost of the Generators and improves the power quality.
    • Design, Installation and Commissioning of DSE Modules in power control systems of LT Power Panels, ATS/AMF Control Panels and PFI Panels.
    • Design & implement the Cable Layout Plan with detail drawings & Project Plans and Execution Chart.
    • Energy Management System, Fuel Management System, Data Logging, Data Acquisition and Remote Monitoring using GSM/GPRS device DSE 830 GSM Modem & Ethernet device DSE 890 Gateway.
    • MODBUS Configuration for data retrieving from RS-485 Port of DSE Modules to various BMS Systems.
    • Programming, Configuration, Layout Design & Commissioning of TCP/IP based on site SCADA System.

Experience as Electrical Engineer

  • Employer

    Pyramid Automation

  • From

    05 September 2011

  • To

    30 April 2013

  • Detail

    • Joined training workshops & Seminars on DSE Generator’s Controllers and Synchronizing & Load Sharing as well as ATS/ AMF PLC Control Modules.
    • Responsible to provide technical support on “Deep Sea PLC UK” and the other principals products also.
    • Review Project Offers, Proposals, Bill of Quantity (BOQ) against drawings to ensure alignment and to identify material types & quantities for cost estimation.
    • Prepare specification documents to submit to the vendor for quotation of cost/ price of material.
    • Scheduling and co-ordinating work to tight deadlines, ensuring the equipment works to it specification.
    • Build a relationship, liaise with internal departments, external suppliers, vendors, and manage daily correspondence and prepare handover documents and provide assistance during the execution stage.
    • Carrying out test procedures, in house research and development, investigating problems, diagnosing and repairing faults, troubleshooting, liaising with installation & project engineers, creating reports and documentation, ensuring safe working conditions and provide assistance during the execution stage.
    • Maintain correspondence with the client, consultant and other stakeholders in the project.

Academic Qualification

Matric 20 June 2001

Degree: Matric (Science) University: Board of Intermediate and Secondary Education Sargodha Marks: 675/850 %age: 79% Division: 1st

Intermediate 19 November 2004

Degree: DAE (Electronics) University: Punjab Board of Technical Education, Lahore Marks: 2413/3350 %age: 72% Division: 1st

Bachelor 10 August 2007

Degree: B-Tech (Pass) Electronics & Communication University: University of Engineering and Technology Lahore Marks: 832/1100 %age: 76% Division: 1st

Bachelor 22 September 2011

Degree: B Sc Electrical/Electronics Engineering University: Bahauddin Zakariya University Multan Marks: 920/1250 %age: 74% Division: 1st
Certifications
Recommend MUHAMMAD NAEEM AKHTAR
Related UserList of Members
Mentor
Not yet Assigned
Profile Answers
Related Professionals
Profession: Electrical Engineer
Current City: Dubai

Profession: Civil Site Engineer
Current City: Riyadh

Profession: Electrical engineer
Current City: Dubai

Profession: ELECTRICAL SUPERVISOR
Current City: chennai

Profession: Telecommunications
Current City: Dubai

Profession: Mechanical engineer
Current City: Pune