Muhammad Raza Iqbal
Project Engineer
Jubail
Summary of Career
1. Planning, defining, verifying & controlling the EPC projects of Modular Packages Skids, Process Equipment's and packages, Boilers & Power Plants from scratch to handover.
2. Planning, Controlling and Monitoring of procurement, manufacturing, erection & commissioning activities.
3. Coordination between the interlinked departments of design, commercials, manufacturing, erection & commissioning.
4. Evaluation of design & its adherence check to the contract.
5. Budgeting of the project & Project cost planning and controlling on monthly and quarterly
6. Progress monitoring & assurance of timely completion of the project, using necessary tools.
7. Conducting project kick off, project health reviews and short storming session’s for discussions regarding improvements and any issues faced by the team.
8. Evaluation of adherence of the products quality to be up to the mark defined by the clients & as per contract
9. Profitability maximization and cost saving in any manner possible without compromising on products standards
10. Audit & Regulatory compliance of overall operations with respect to company own controls and regulation and of local Govt.
Experience as Project Leader
Descon Engineering FZE
22 March 2013
22 December 2018
• Project: Engineering, procurement and Construction of Static Equipment’s (Scrubbers, Knock out Drums, Reactors, Heaters, Filters) inclusive structural work
Client: Honeywell USA / PARCO PENEX Expansion
• Project: Construction and supply of Flare Recovery Process units – Demountable flare risers and Water Seal drums inclusive structural work
Client: Saudi Aramco / SK Engineering and Construction / John Zink Hamworthy Combustion Sorel
• Project: Storage Tanks inclusive Structural work - Brown Field - EPCC project
Client: ADMA / Chiyoda CCC Engineering LTD
• Project: Engineering and Fabrication of Cladded Vessels and Alloy Vessels (Scrubbers, Filters and Super Heaters)
Client: ADMA / Technip / Frames
• Project: Fabrication and supply of the Derricks, Flare risers, Structure and utilities lines
Client: British Petroleum Oman / Petrofac LLC / John Zink Hamworthy Combustion S.r.l
• Project: Twin pack HRSG 21TPH, 50 Bar – Brown Field - EPCC Project
Client: Engro Fertilizers Limited
• Project: 1 × 3 TPH, 13 BARG, Saturated Steam, Waste Heat Recovery Boiler – EPCC Project of Brown Field
Client: Unilever Pakistan LTD
• Project: Fabrication and Construction of Alloy Pipe lines & tie ins of power plant piping– Bio Mass Boiler 150TPH
Client: BULLEH SHAH Packages Pvt. LTD (Joint Venture of STORA ENSO OYJ)
• Project: EPCC 30 MW Cogen Power Plant i.e. 1 x 140 TPH, 65 BARG, 485° C Bagasse Fired Boiler along with Ancillaries
Client: RYK Sugar Mills Limited
• Project Turnkey solutions of Static Equipment i.e. Heat Exchangers & Suction Scrubber ( U Stamped Job)
Client: OGDCL Pakistan
• Project: Design, Fabrication, Supply and Commissioning of Well Head Package (Methanol Injections Skids)
Client: OGDCL Pakistan / Zeeshan Engineers Limited
• Project: Modular packages i.e. Corrosion Inhibitor Skids & Sour Gas Conditioning Skids on EPC basis
Client: OMV Exploration Limited
• Project: Turnkey solutions of Static Equipment i.e. Slug Catcher and Pig Launchers & receivers
Client: OMV Exploration Limited
Experience as Project Engineer
05 March 2018
30 April 2020
• Project: Up Stream Package Equipment on EPCC i.e. Oil Modular Skids Packages & Gas Modular Skid Packages, Chemical Injection Packages, Annuli Risers skid and OPTF skid (77 Nos)
Client: Saudi Aramco Oil Company & Consultant: Jacobz Zate Engineering
• Project: Upstream Package equipment on EPCC i.e. Engineering, Procurement, Fabrication, Commissioning and Testing of Multi Pump Skid package and Methanol Injection Skid Packages ( 08 Nos)
Client: Saudi Aramco Oil Company & Consultant: SNC-Lavalin Fayez Engineering
Bachelor 24 November 2011
B.Sc Engineering Faculty of MechanicalIntermediate 02 August 2007
HSSC/ F.Sc (Pre-Engineering)Matric 02 August 2005
SSC/Metric (Science)