saman

Planning Engineer
Dubai


Profile Views 206

Recommendations (0)
Last Seen: 14 February 2020 7:46 PM

Skills
• Well familiar with structural analyzing and design in context to Euro codes practice. • CSI - Etabs 2016 • Primavera Project Management Ver 6.0 • Microsoft Project 2007/2010 MS Office Packages 2007/2010 • AutoCAD 2010/2015 • Strong Interpersonal Commu
  • Experience
    10 Years
  • U.A.E Experience
    Fresh
  • Industry
    Engineering
  • Nationality
    Srilankan
  • Visa status
    Not Applicable
  • Qualification
    Master - MSc Structural Design and Construction Management with Merit
  • Driving License: Srilanka
Other Matching Titles/Position
Project Engineer
Structural Engineer
Civil Engineer
Construction Engineer
QS Engineer
Industry Titles
Engineering

Summary of Career

1. Prepare and manage overall master schedule integrating work breakdown structure using scheduling software.


2. Understand WBS structure , and work with management and project/maintenance team in the development of work break down structure for progress measurement, scheduling ,cost estimating and project control.


3. Understand contractual matter, earn value method , familiar with scope management and change control


4. Coordinate schedule from multiple contractors and incorporate the information gathered into the overall project master schedule


5. Prepare cost estimation and schedule bar chart plan considering all in puts (manpower, equipments and materials ) availability, production and construction sequences


6. Understand and able to utilize planning tools of MS Project and Primavera6


7. Develop and update resource (manpower and equipment) histogram weekly or monthly as required


8. Evaluate allocation of resources and provide recommendations to maintain required progress


9. Develop and implement plan versus actual progress charts (histograms/S curves). Reports and analyses deviations from plan.


10. Analyze gaps between the planned and actual progress and highlight the areas of concern which required action of the associate task member.


Work Experience (Employment History)

Experience as ASSISTANT ENGINEER - CIVIL

  • Employer

  • From

    22 February 2009

  • To

    14 September 2010

  • Detail

    • Supervision of formwork, rebar and concreting Activity at the site.
    • Construction of internal road system and car parks with excavation,filling,compaction,ABC laying and compaction Aspholt laying,paving work and road marking.
    • Preparing of Bar Schedules relevant to Concrete RC structure.-
    • Organizing daily work inspections with the Consultant
    • Presence of daily post-work meetings with the Site Engineer to keep him informed of progress and the next day work schedule.
    • Coordinate with: Design Engineer’s, QA/QC Engineer, Quantity Surveyor, Safety Officers, Surveyors, CAD Draftsman, Foremen and Consultant Staff/ Employer

Experience as JR.CIVIL ENGINEER

  • Employer

  • From

    09 December 2010

  • To

    14 January 2014

  • Detail

    • Supervision Of Formwork, Rebar,Pilling,Shoring And Concreting Activities.
    • Organizing work inspection with consultant and client.
    • Coordinate schedule from multiple contractors and incorporate the information gathered into the overall project master schedule.
    • Track, monitor and forecast progress of all activities and deliverable such as products, engineering documents, fabrication status and construction of all discipline.
    • Prepare and update three weeks and three months look-ahead schedule that reflect the priority activities

Experience as SITE-CIVIL- ENGINEER

  • Employer

  • From

    24 May 2014

  • To

    09 February 2015

  • Detail

    • Supporting to planning section to develop a fully detailed Project Schedule with primavera version 6.0
    • Supervision and Monitoring The Excavation to the Raft Foundation And Basement Structure.
    • Supevision And Monitering of Pile Crushing,Pile Build up And Testing Activities.
    • Organizing work inspection with consultant and client.
    • Supervision Of Formwork, Rebar And Concreting Activities.
    • Solving technical issues prior to construction period to avoid any delaying.(with design and structural department).
    • Provide planning, progress monitoring services with respect to the baseline programme.
    • Developed the sub programme for each sub activities.
    • Coordination with Consultant and Client.

Experience as PLANNING ENGINEER

  • Employer

  • From

    06 March 2015

  • To

    10 August 2016

  • Detail

    • Provide planning, progress monitoring services with respect to the baseline programme.
    • Developed the sub programme for each sub activities.
    • Resource, Material & Cost Management in Primavera P6 / Ms Project.
    • Provide planning input into weekly and monthly project reports.
    • Preparation of Monthly progress report and presentations.
    • Review and analyze updated programs and inform Project Management of any delays and or time related risks.
    • Liaise with project engineers, managers and key team members to develop schedules.
    • Coordination with Consultant and Client.

Experience as PLANNING ENGINEER

  • Employer

  • From

    01 September 2016

  • To

    11 July 2019

  • Detail

    • Understand WBS structure , and work with management and project/maintenance team in the development of work break down structure for progress measurement, scheduling ,cost estimating and project control.
    • Prepare and manage overall master schedule integrating work breakdown structure using scheduling software.
    • Understand contractual matter, earn value method , familiar with scope management and change control.
    • Coordinate schedule from multiple contractors and incorporate the information gathered into the overall project master schedule.
    • Prepare cost estimation and schedule bar chart plan considering all in puts (manpower, equipments and materials ) availability, production and construction sequences.
    • Understand and able to utilize planning tools of MS Project and Primavera6
    • Develop and update resource (manpower and equipment) histogram weekly or monthly as required.
    • Evaluate allocation of resources and provide recommendations to maintain required progress.
    • Develop and implement plan versus actual progress charts (histograms/S curves). Reports and analyses deviations from plan.
    • Track, monitor and forecast progress of all activities and deliverable such as products, engineering documents , fabrication status and construction of all discipline.
    • Analyze gaps between the planned and actual progress and highlight the areas of concern which required action of the associate task member.
    • Perform probabilistic analysis of completion dates and potential alternatives. Present risk based analysis of most likely completion and expected deviation range.
    • Prepare and update three weeks and three months look-ahead schedule that reflect the priority activities

Academic Qualification

Master 18 October 2019

MSc Structural Design and Construction Management with Merit

Bachelor 09 February 2018

BSc(Hons) in Civi l and Structural Engineering (Class II Division I )

Matric 10 February 2010

National Diploma In Technology in Civil Engineering
Certifications
Recommend saman
Related UserList of Members
Mentor
Huma Syed

Compliance & Anti-Money Laundering
Dubai

Last Login: 02 January 2021 11:38 PM
Profile Answers
Related Professionals
Profession: HSE /Safety Officer
Current City: Dubai

Profession: Industrial Engineering
Current City: Abu Dhabi

Profession: Estimation & Proposal Engineer / Tender Coordinator
Current City: Ajman

Profession: Instrumentation and control engineer
Current City:

Profession: Project engineer
Current City: NAVI MUMBAI

Profession: Electrical Engineer
Current City: