umar nazir
Civil Engineer
Dubai
Summary of Career
1. Managed day-to-day operational aspects of projects and project scope including estimation, billing & so on by effectively applying methodologies that enforce project standards and minimizing project risks
2. Anchored on-site construction activities to ensure completion of project within the time & cost parameters and effective resource utilization to maximize the output
3. Deployed suitable manpower and equipment / materials and proper planning to ensure timely execution of the projects.
4. Developed and examined drawings, designing plans, reports, technical specifications & BOQ for regulatory approvals and contract issues; created project initiation documentations
5. Finalized requirements & specifications in consultation with clients as well as managed project scheduling including material & manpower planning
6. Established time span of project execution as per client specifics; listed down the resource needs for projects, after considering the budgetary parameters set.
7. Supervised all construction activities including providing technical inputs for methodologies of construction & coordination with site management activities; monitored project status during the course of periodic project review meetings.
8. Networked with Architects, R.C.C/ Service/ Acoustic Consultant, Government Authorities and so on to ascertain technical specifications; maintained relationships with statutory authorities for availing mandatory sanctions.
9. Mapped the requirements for the material needed for the sites by liaising with the QC / QA Departments.
10. Assisted in applying Quality Management Systems across various processes to reduce rejection levels and ensure high quality standards at all the stages of production.
Experience as Site supervisor
07 June 2012
20 August 2013
I was site supervisor in stone Builders and my responsibilities are Completion of work on Time, Ensure the material delivery on time, Ensure the quality of material, Ensure the quality of work, Ensure the safety of project, Reporting and billing, Estimation, surveying.
Experience as Site Engineer
New Peak Construction Service Pvt Ltd
04 November 2017
10 December 2019
--Exposure in swiftly ramping up projects with competent cross-functional skills and on time execution
--Key Resource Planner with hands-on experience in planning for manpower, material & money for successful completion of projects within time & budget constraint
--Experienced in preparing the project evaluation framework to assess the strengths & identify the areas of improvement; ensuring that all activities are operated as per policies and quality standards
--Skilled at organizing & controlling programs with respect to cost, resource deployment, time overruns and quality compliance to ensure satisfactory execution of same
--Proficiency in preparation of detailed Cost Estimations, Drawings, Specifications, B.O.Q., Enquiry, Comparative Statements and Invoices along with mobilization of equipment & material
--Resourceful in drafting timely, relevant & accurate reports of project’s performance to facilitate decision-making towards achievement of budget & strategic plan
--Exemplary relationship management, communication skills with the capability to network with project members, consultants, contractors, govt. authorities and statutory agencies with consummate ease
Intermediate 18 April 2012
Deploma of Associate Engineering(DAE) in Civil Technology from Chenab Institute of Technology Gujrat, PakistanBachelor 29 August 2017
BSc civil Engineering from University of South Asia, Lahore, Pakistan