Aftab Ahmad
---
Summary of Career
1. Prepare PTW and follow the Safety Rules
2. Attend Site inspection with consultants in compliance with approved dwgs/specs/material
3. Quality Control and supervised Subcontractor Work
4. Look after Fire Alarm System
5. Fire Suppression System (FM-200 & Novec)
6. Indoor/outdoor lighting system and DALI
7. Small Power
8. Power Cable Jointing & Termination
9. Street/Road Lighting
10. ECS System
Experience as Sub Engineer Electrical
20 June 2008
17 September 2009
Pad Mountain Transformers PMT, Ring Main Unit RMU installation & Energized
Power DBs, MDBs, SMDBs, Lighting Control Panels installation & Energized
Street Light Poles Single/Double Arm Installation & Energized
Power Cables HT Glanding and Termination in PMT, RMU
Power Cable LT Glanding and Termination in DBs, SLCP
Straight though joint of HT/LT Power cable
Meggering, Testing and Hi Potential Test of Power Cables
Earthing of Electrical Equipment’s PMT, RMU, SS, DBs
Matric 15 July 2005
ScienceIntermediate 06 December 2008
DAE ElectricalBachelor 30 March 2013
B-Tech Pass ElectricalMaster 30 November 2015
B-Tech Hons Electrical