Mehmood Ishaq
Mechanical Site Engineer
Karachi
Summary of Career
1. An ambitious, enthusiastic, dedicated, responsible, dependable and highly self-motivated individual dedicated in providing service of outstanding quality.
2. More than 5 Years of work experience in Construction Field, current working position is Site Inspector.
3. Worked for Planning & Execution of different power plants.
4. Coordinate all resources to ensure project execution and completion as per agreed budget.
5. Provide support to Foremen to ensure contract specifications requirements are met.
6. Ensure that Work Procedures and Method Statements for all work activities are prepared and followed during work execution.
7. Review Plant, Labor and Material allocations and advise Project Manager of any potential problems.
8. Ensure that work are constructed as per approved drawings and specifications.
9. Attended meetings with client & designer.
10. Verification of bills submitted by contractors.
Experience as Site Inspector
Isotec Consultants
01 January 2018
19 November 2019
Working as a Site Inspector at 6 MW waste heat recovery power plant.
Major Responsibilities:
• Planning & Execution for “Fabrication, Erection, Testing & Commissioning Work Of 6 MW Waste Heat Recovery Power Plant At Thatta Cement Company Limited”.
• The work included installation of Steel Structure & Equipment of AQC Boiler, SP Boiler, Gas Engines Boilers, Turbine & Generator, Cooling Tower, Pump House & Chemical Water Treatment Plant.
• Installation of Piping for Boilers, Chemical Water Treatment Plant, Cooling Tower, Pump House & Turbine Area.
• Performed site inspections as per design.
• Attended meetings with client & designer.
• Verification of bills submitted by contractors.
• Inspection of Insulation & refractories works.
Experience as Site Engineer
Shin Kwang Contracting LLC,Abu dhabi
14 November 2016
14 November 2017
Worked as a Site Engineer at 5600 MW barakah nuclear power plant.
Major Responsibilities:
• Planning & Execution for steel structure work of 5600MW Power Plant.
• The work included installation of steel structure works of Turbine & Generator Building, Reactor Containment Building, Auxiliaries Building, Water Treatment Building, Closed Cooling Water Building & Emergency Water Service Building.
• To attend daily progress & planning meetings.
• To implement Safety Culture & follow up.
Experience as Site Engineer
Mechcon Pvt Ltd
25 May 2014
31 October 2016
Worked as a Site Engineer at following power plants:
a) 7.5 MW Waste Heat Recovery Power Plant at Bestway Cement Limited.
b) 06 MW Waste Heat Recovery Power Plant at Dewan Cement Limited.
c) 12 MW Waste Heat Recovery Power Plant at Pakistan Cement Limited.
Major Responsibilities:
• Planning & Execution of different power plants.
• The work included installation of Steel Structures & Equipment of AQC Boiler, SP Boiler, Turbine & Generator, Cooling Tower, Pump House & Chemical Water Treatment Plant.
• Installation of Piping for Boilers, Chemical Water Treatment Plant, Cooling Tower, Pump House &Turbine Area.
• Performed site inspections as per design.
• Attended meetings with client & designer.
• Verification of bills submitted by contractors.
• Inspection of Insulation & refractories works.
Matric 01 August 2008
Matric scienceIntermediate 04 September 2010
Fsc (pre_engineering)Bachelor 05 August 2014
Bsc (mechanical engineering)