Mohammed Arief

Electrical Engineer
Abudhabi


Profile Views 199

Recommendations (0)

Skills
EXPERT IN LOCATING UNDER GROUND CABLE FAULTS UPTO 33KV USING BAUR TESTING KIT. CABLE ROUTE LOCATION CABLE IDENTIFICATION CABLE INSULATION RESISTANCE TEST PARTIAL DISCHARGE TEST THERMOGRAPHIC TEST EARTH PIT RESRANCE TEST
  • Experience
    6 Years
  • U.A.E Experience
    --
  • Industry
    Engineering
  • Nationality
    Indian
  • Visa status
    Visit Visa in UAE
  • Qualification
    Bachelor - B.TECH in ELECTRICAL AND ELECTRONICS ENGINEERING
  • Driving License: UAE
Other Matching Titles/Position
Industry Titles
Engineering

Summary of Career

1. Underground Cable Laying of 33kV, 22kV, 11kV and LV Cables.


2. Testing and locating the distance of underground cable for fault location for cables up to 33kv using BAUR testing kit.


3. All Type of Cable Termination and Joints up to 33kV Cables.


4. Maintenance of LV power cables for rectifying the power if there is any fault in the cable.


5. Identifying Cable Rout & cable Identification for cables up to 33KV.


6. Cable Laying of Fiber Optic Cables. • Cable IR Test, DC Conductor Resistance & Test up to 33kv Cables.


7. • Cable 0.1 Hz VLF testing up to 33kV cables. • Cable Fault Locator testing up to 33kV Cables.


8. Installation of LV Panels, LV Feeder Pillars, LV lightening panels. • Panels Installation of SMDB, DB, LV panels, LV feeder Pillars. • Installation of Streetlight Poles.


9. Operation & Maintenance of 22kV/415V Substations and 11kV/415V Substations including Transformers. • Supervising and organizing of maintenance works (including PPM, monthly and annual maintenance) for all yas island projects (yas mall, Water Park, Ferrari world, Yas marina circuit), ALDAR HQ, al muneera, al Bandar, al zeena, al raha gardens and projects in Abu Dhabi. • Maintenance Testing of Transformers, MV Switchgears, LV Switchgears &Battery charger. • Earth Resistance, Partial Discharge and


10. Preparation of Method of Statements and Risk analysis and Job Safety analysis. • Review and submission of daily, weekly and monthly reports to the clients. • Recognize issues and advises planner scheduler to implement. • Lead Project Control Scheduling and planning team. • Attending site progress meetings and Review & approval of drawings. • Planning and execute of every day field activities as per the Project Specification. • Allotment of daily job to the Supervisor of various execution teams.


Work Experience (Employment History)

Experience as ELECTRICAL ENGINEER

  • Employer

  • From

    16 November 2013

  • To

    15 May 2014

  • Detail

    • Installation of LV Panels, LV Feeder Pillars, LV lightening panels.
    • Panels Installation of SMDB, DB, LV panels, LV feeder
    Pillars.
    • Installation of Streetlight Poles.

Experience as ELECTRICAL ENGINEER TRAINEE

  • Employer

  • From

    15 November 2012

  • To

    15 November 2013

  • Detail

    Operation & Maintenance of 22kV/415V Substations and 11kV/415V Substations including Transformers.
    • Supervising and organizing of maintenance works (including PPM, monthly and annual maintenance) for all yas island projects (yas mall, Water Park, Ferrari world, Yas marina circuit), ALDAR HQ, al muneera, al Bandar, al zeena, al raha gardens and projects in Abu Dhabi.
    • Maintenance Testing of Transformers, MV Switchgears, LV Switchgears &Battery charger.
    • Earth Resistance, Partial Discharge and Thermo graphic Test.

Experience as ELECTRICAL ENGINEER

  • Employer

  • From

    28 November 2014

  • To

    16 September 2018

  • Detail

    • Underground Cable Laying of 33kV, 22kV, 11kV and LV Cables.
    • Testing and locating the distance of underground cable for fault location for cables up to 33kv
    using BAUR testing kit.
    • All Type of Cable Termination and Joints up to 33kV Cables.
    • Maintenance of LV power cables for rectifying the power if there is any fault in the cable.
    • Identifying Cable Rout & cable Identification for cables up to 33KV.
    • Cable Laying of Fiber Optic Cables.
    • Cable IR Test, DC Conductor Resistance & Test up to 33kv Cables.
    • Cable 0.1 Hz VLF testing up to 33kV cables.
    • Cable Fault Locator testing up to 33kV Cables.
    •22kV Cable Laying, Plug in Termination and Straight through Joints for ALDAR Properties at YAS ISLAND.
    • 22kV Cable Termination and Straight through Joints for ALDAR Properties at YASMALL.
    • Installation of 11kV Cable Joints for SAS AL NAKHL at Abu Dhabi.

    • Installation of 1500KVA oil transformer 11kv/415v in Hameem workers village.
    • Installation of 33kV Cable Termination and Straight through Joints in emirates steel
    Mussafah.
    • 22kV Cable Termination and Straight through Joints for MASDAR CITY ABUDHABI.

Academic Qualification

Bachelor 01 May 2012

B.TECH in ELECTRICAL AND ELECTRONICS ENGINEERING
Certifications
Recommend Mohammed Arief
Related UserList of Members
Mentor
Not yet Assigned
Profile Answers
Related Professionals
Profession:
Current City:

Profession: Civil draughtsman
Current City:

Profession: assistant manager service ( power motorcycle)
Current City: Islamanad

Profession: Manager - Sales & Operations
Current City: Dubai

Profession: Mechanical
Current City: Karachi

Profession:
Current City: Dubai