Faisal Suleman
Electrical Engineer
Lahore
Summary of Career
1. Evaluate project specifications, ensure to that all documents are approved before commencing to inspection. Approved Material submittal, Approved Shop Drawing, Approved Method Statement and Approved ITP. Reporting direct to Site Superintendent. Ensure work compliance under Electrical Engineering Standards, IEEE, NEMA, IEC, BS, NFPA, and other internal standards for electrical installation that will apply on the project
2. -Designing and installation supervision of Sandwich type Bus bar Trunking system from 25amps to 6400amps.
3. Making BOQ of Bus way supporting system and Bus way.
4. -Installation supervision of dry type transformers, MDB’s, SMDB’s, Lighting and power DB’s and PFI Panels.
5. -Testing and commissioning of Bus bar Trunking system.
6. -Site Supervision and managing manpower and making schedule for on time completion of project. -Making of shop drawings and methodology of execution and submit to Consultant.
7. Check and review construction/installation sketches and/or shop drawings, ensure that the sketches/drawings conform to the project specifications and standards
8. To monitoring the inspections & testing and make sure, if it is conducted as per Standard & complying all the Project specifications.
9. Site Inspection for the Electrical Installations, Electrical Equipment, Cables Laying, Cable jointing, Indoor & Outdoor lighting Explosion Proof Carbon Loaded Junction Boxes, Explosion Proof LED Lights, Explosion Proof Snap Switches, Instruments, Level Switches Different sizes Instruments Cables, Perforated Cable Tray, Explosion Proof Cable Lugs, Early Streamers & Local Control Station.
10. Identifying and recording quality problems and opportunities for improvement, and initiating or recommending solutions
Experience as Project Engineer
Jubilee Corporation
01 January 2018
24 September 2019
At present, I am performing my duties as Project Engineer of renowned Switchgears Company of Pakistan Jubilee Corporation. I am responsible of Busway designing, execution and testing commissioning and also making proposals of different projects in Punjab, KPK and Azad Kashmir. Here I am also responsible of switchgears Execution and maintenance.
Main Projects:
1) Jadeed Feed Mill Faisalabad
2) Pearl Cineplex Mall Lahore July
3) Best Export Textiles Faisalabad
4) Mall of Multan
5) Mukhtare-e- Sheikh Memorial Hospital Multan
6) Coronet Foods Hatter Haripur.
7) PENTA SQUARE MALL Lahore
Evaluate project specifications, ensure to that all documents are approved before commencing to inspection. Approved Material submittal, Approved Shop Drawing, Approved Method Statement and Approved ITP. Reporting direct to Site Superintendent. Ensure work compliance under Electrical Engineering Standards, IEEE, NEMA, IEC, BS, NFPA, and other internal standards for electrical installation that will apply on the project.
-Designing and installation supervision of Sandwich type Bus bar Trunking system from 25amps to 6400amps.
-Making BOQ of Bus way supporting system and Bus way.
-Testing and commissioning of Bus bar Trunking system.
-Installation supervision, configuration, Testing and commissioning of dual Tariff energy Management system.
-Installation supervision of dry type transformers, MDB’s, SMDB’s, Lighting and power DB’s and PFI Panels.
-Proposal working of Bus bar trunking system on various projects.
-Installation supervision of Breakers and rotary handles in Tap-off Boxes.
-Installation supervision of tap-off Boxes on Bus bar.
-Site Supervision and managing manpower and making schedule for on time completion of project.
-Making of shop drawings and methodology of execution and submit to Consultant.
-Provided design data for engineering applications using AutoCAD, MS Word files, Excel Sheets and Interpretation of drawings, specifications and field issue.
-Managing the time and resources in a proper and timely manner and Keeping track of daily work activities.
Bachelor 15 December 2014
BSC Electrical Engineering