Salahuddin
Interior Design
Dubai
Summary of Career
1. Making DD (Design Development) package of drawings.
2. Co-ordination with MEP consultant, Fire fighting consultant & Lighting consultant then implement into drawings (Reflected ceiling plan & detail drawings)
3. Co-ordinate with architect if structural changes required as per our interior design.
4. Co-ordinate with F.F & E designer for finishes, sizes and codes.
5. Check the drawings carefully before handing over to Project manager.
6. With help of Autolisp speed up the work and reduced the time by 20%.
7. Upgraded the Quality of Detail drawings.
8. Reduced the mistakes in comments / Revisions by self checking system.
9. Setup the contents Library and Details Library to work faster.
10. Created Dynamic Blocks to Speed up the process.
Other 01 March 1994
Diploma in Interior Design