Taimur Ali
Electrical LV/ELV Engineer
Doha
Summary of Career
1. • Electrical LV/ELV system Survey , Shop Drawing Designing , and Installation(all fixes) • BMS System Survey , Shop Drawing Designing , and Installation
2. • Sub Main LV Room Distribution System Installation.
3. • Fire Alarm and Fire Telephone System Survey, Shop Drawing Designing, and Installation.
4. • Leak Detection system Survey, Shop Drawing Designing, and Installation
5. • Designing of DB,SMDB & Load Schedule
6. • Quantity take-off and BOQ Drafting for Purchase Order of Materials/Items.
7. • Thoroughly Supervising and Studying Actual work Activities and Project Specification/BOQ for any variation ,
8. • Preparation of Work Progress Summary
9. • Daily report, weekly Meeting Presentation and Weekly progress report Preparation.
10. • Enquiry Request to Suppliers / Vendors / Manufactures for Materials/Items.
Experience as Electrical Engineer/ project Coordinator
MAFTEC Consultant Peshawar Pakistan
30 June 2016
30 June 2016
• Bidding and execution of the project installation of Solar Electric system TMA office Samar BaghDir
• Designing and execution of solar street light system for Samarbagh bazar Bala and Payan Dir.
• Skill development program for FATA SMEs by Tribal Area chamber of commerce and Industry
Experience as Electrical/ Electromechanical maintenance Engineer
SVA Rubba Plastic Injection Molding PVT LTD LAHORE Pakistan
01 July 2016
30 September 2017
• HV Room Electrical Power System Designing, Installation.
• Forecasting of spare parts
• Estimation of maintenance costs and evaluation of alternatives
• Electrical power and Control circuit designing Single/3-phase LV system.
• Molding Machinery Electromechanical/control system maintenance and troubleshooting
• Maintenance and designing of molds hot runners
Experience as Electrical/Project Engineer
ALM
01 October 2017
17 April 2019
Responsibilities as an Electrical Engineer:
• Electrical LV/ELV system Survey , Shop Drawing Designing , and Installation(all fixes)
• BMS System Survey , Shop Drawing Designing , and Installation
• Main LV Room (11KV Substation) Transformer Installation, Cable Termination.
• Sub Main LV Room Distribution System Installation.
• Fire Alarm and Fire Telephone System Survey, Shop Drawing Designing, and Installation.
• Leak Detection system Survey, Shop Drawing Designing, and Installation
• Designing of DB,SMDB & Load Schedule
• Quantity take-off, BOQ Drafting, Proposal and EOI’S for new projects.
• Quantity take-off and BOQ Drafting for Purchase Order of Materials/Items.
• Drafting of Method Statements
Responsibilities as a Junior Project Engineer:
• Preparation of Work Breakdown Structure , KPI’S and scheduling
• Daily report, weekly Meeting Presentation and Weekly progress report Preparation.
• Enquiry Request to Suppliers / Vendors / Manufactures for Materials/Items.
• Thoroughly Supervising and Studying Actual work Activities and Project Specification/BOQ for any variation ,
• Preparation of Work Progress Summary
• Resource Spread Sheet I.e. Man Power Histogram / S-Curve
Bachelor 01 October 2013
B.E Electrical Engineering