1. To study the contract documents, PTS and construction drawings and also prepare project documentation and conduct meeting with client.
2. To look after of construction activities and ensures that all the works are according to the approved construction drawings, contract documents, project specifications, and all applicable standards.
3. Shifting, Installation, termination and commissioning of Switchgear and Control panels, Lighting and emergency panels, Annunciation and SCADA panels.
4. Commissioning of Numerical Protection relays, Auxiliary Relays, Power, Station Service and Dry type transformers, MCCB, MCB and Control Relays, SCADA, SOE, and Annunciation Panels.
5. Installation, Testing and commissioning of Switch gear, Main Distribution Board, Lighting panel, GIS LCC, Bus bar protection panels, Line Protection Panels, DTR, DFR, FOX 515, AC/DC panels.
6. Shifting, Installation, termination and commissioning of AC/DC Motors, controlling devices and switches and variable speed drives, UPS batteries and Chargers.
7. Preparation of HT, LT and control cables schedules and supervision for laying of cables (underground and above ground).
8. To do the laying of earthing cables for plant mesh and also for equipment earthing.
9. To perform meggering for HT, LT and Control cables and Motors.
10. To perform Hi-POT of HT and MV cables.
Experience as Foreman-Electrical
Saudi Services for ElectroMechanical
05 June 2010
24 December 2013
To do the fabrication of cable trays and Ladders, cables trays supports, steel base foundation of panels, DB’s etc.
To do the laying of Power (HT & LT) and control cables.
To do the termination of Power and control cables on both ends.
To do installation, conduiting, glanding, meggering and termination for Motors, Switchgears and other equipments.
To do manage site materials and manpower.
Experience as Electrical Supervisor
Descon Power Solutions
17 October 2018
13 March 2019
Shifting, Installation and termination of Electrical Switch gear Panels, DB’s, and Motors.
Overhauling of Motors and Circuit Breaker
To do shifting of Electrical equipments from client warehouse to site safely.
To do replacement of faulty electrical components such as Motors, Circuit Breakers, Contactors, relays, switches, and sensing devices by using standard testing equipments and hand tools.
To carryout preventive maintenance i.e Meggering, loose connection, Bearing replacement and Greasing of motors.
Experience as Electrical Engineer
VINCI Energies (OMEXOM)
22 December 2014
16 February 2017
To study the contract documents, PTS and construction drawings and also prepare project documentation and conduct meeting with client.
To arrange meetings with client & senior management to provide feedback for new and/or updated drawings, ongoing activities and schedules.
Formulation of strategy and activities plans to achieve the safe and smooth work progress.
Perform regular analysis of all schedule trends and monitors progress periodically and compares it with the baseline planning
To look after of construction activities and ensures that all the works are according to the approved construction drawings, contract documents, project specifications, and all applicable standards.
Shifting, Installation, termination and commissioning of Switchgear and Control panels, Lighting and emergency panels, Annunciation and SCADA panels.
Commissioning of Numerical Protection relays, Auxiliary Relays, Power, Station Service and Dry type transformers, MCCB, MCB and Control Relays, SCADA, SOE, and Annunciation Panels.
Installation, Testing and commissioning of Switch gear, Main Distribution Board, Lighting panel, GIS LCC, Bus bar protection panels, Line Protection Panels, DTR, DFR, FOX 515, AC/DC panels.
Shifting, Installation, termination and commissioning of AC/DC Motors, controlling devices and switches and variable speed drives, UPS batteries and Chargers.
Preparation of HT, LT and control cables schedules and supervision for laying of cables (underground and above ground).
To perform Plant lighting and lightning arrestor.
To do the laying of earthing cables for plant mesh and also for equipment earthing.
To perform meggering for HT, LT and Control cables and Motors.
Experience as Foreman-Electrical
Drydocks World Dubai
06 November 2019
22 February 2021
Preparation of Safe Work Method statement, PTW and LOTOTO for the specific task.
To ensure all safety measures are taken prior to start the job.
To do the site coordination with Riggers, Scaffolding, mechanical and transportation department.
Shifting, Installation, termination and commissioning of Switchgear and Control panels, Lighting and emergency panels.
Shifting, Installation, termination and commissioning of Ex equipments (JB’S, Lights, Control and Power Panels, Fire detector, Smoke detectors, Control and Pressure valve, Horn etc) as per project specification.
Fixing of Equipments foundations
To do the installation of Ex Cable trays and cable ladders.
Laying, dressing and termination of Ex Cables (LSF and LSHF) Power and control cables
Cables glanding (Ex) and termination.
To raise the Inspection request and get approved from client.
To assist the commissioning activities.