Haseeb Ur Rehman
QAQC ENGINEER
DOHA QATAR`
Summary of Career
1. Developed and submitted QA/ QC documents such as method statement, inspection and test plan, subcontractor approval, material approval request and checklist base on project specification.
2. Ensured all activities are carried out as per QCS.
3. Carried out daily inspection alongside the Construction team, Sub contractors and the consultant.
4. Carried out internal inspection in order to ensure activities at the site are as per approved method statement and inspection test plan.
5. Reviewed and understood the contract documents, detailed drawings, project specification standard and health and safety measure pertaining to project implementation.
6. Identified site non-conformities and evaluated the sub-contractor’s corrective action in line with set quality procedures, project technical specification QCS.
7. Closed NCR issued by Client through coordination with the Construction team.
8. Reported to the QA/QC Manager, control, and monitor all activities related to quality.
9. Monitored and ensured the implementation of the Project Quality Plan.
10. Closely coordinated with 3rd party testing companies in order to complete all tests required such as calibration, test results, concrete compression, Soil Bearing Test, Field Density Test (FDT) Pull out, Pull off, NDT of hardened concrete, Air Infiltration Test, Water Penetration of facades & test Related to waterproofing and Coatings.
Experience as QAQC ISNPECTOR / SITE ENGINEER
FWO
02 February 2016
30 May 2017
Executed site activities as per the approved drawings, method statement and specification.
Supervised construction work of Highway, structures such as Bridges, Pipe Culvert, Box culvert & Subway.
Coordinated with subcontractors to ensure the timely and high quality completion of their scope.
Supervised every activity related with RCC structures, finishing work.
Coordinated effectively and successfully with the client for the acceptance of the construction works.
Ensured the effective use of the construction equipment and machinery deployed at the project site.
Performed different test as per required on site i.e. slump test, cylinder test and FDT etc.
Prepared daily/ weekly and monthly progress reports.
Ensured the projects meet agreed specifications, budgets or timescales.
Day-to-day management of the site, including supervising and monitoring the site labor force and the work of any subcontractors.
Planning the work and efficiently organizing the labor and site facilities in order to meet agreed deadlines.
Experience as QAQC ENGINEER
REDCO International, Trading and Contracting, Wll, Qatar
24 February 2020
15 April 2021
Developed and submitted QA/ QC documents such as method statement, inspection and test plan, subcontractor approval, material approval request and checklist base on project specification.
Ensured all activities are carried out as per QCS
Carried out daily inspection alongside the Construction team, Sub contractors and the consultant.
Carried out internal inspection in order to ensure activities at the site are as per approved method statement and inspection test plan.
Reviewed and understood the contract documents, detailed drawings, project specification standard and health and safety measure pertaining to project implementation
Identified site non-conformities and evaluated the sub-contractor’s corrective action in line with set quality procedures, project technical specification QCS
Closed NCR issued by Client through coordination with the Construction team.
Reported to the QA/QC Manager, control, and monitor all activities related to quality.
Monitored and ensured the implementation of the Project Quality Plan.
Closely coordinated with 3rd party testing companies in order to complete all tests required such as calibration, test results, concrete compression, Soil Bearing Test, Field Density Test (FDT) Pull out, Pull off, NDT of hardened concrete, Air Infiltration Test, Water Penetration of facades & test Related to waterproofing and Coatings.
Prepared of Inspection Requests (IRE’s) & Material Inspection Requests as per project activities
Carried out final inspections to ensure compliance with specifications.
Coordinated with the Sub-Contractor’s QA/QC, ensuring high quality results.
Bachelor 30 December 2015
Bachelor of Civil EngineeringMaster 23 June 2019
Master In Project ManagementProject Management Professional