Pooja Tiwari


Dubai


Profile Views 168

Recommendations (0)
Last Seen: 03 October 2024 12:16 AM

Skills
  • Experience
    More than 15 Years
  • U.A.E Experience
    Fresh
  • Industry
    Oil , Gas & Energy
  • Nationality
    Indian
  • Visa status
    On Spouse Visa
  • Qualification
    Bachelor - B.Tech, Mechanical Engineering
  • Driving License:
Other Matching Titles/Position
NULL
Industry Titles
Oil , Gas & Energy

Summary of Career

1. RFQ, RFP preparation for DECs, Fabricators, Valve vendors, TQs closures and release Technical Bid Evaluations (TBE).


2. Leading KOM with valve vendors, fabricators, DEC's. Tracking schedules, resolving technical queries with regular meetings/shop visits and follow up till final deliveries from vendors.


3. Work closely with the proposal management team to support new bidding opportunities timely & efficiently.


4. Coordinate Material Take-off (MTO) activities, identify irregularities, discrepancies, and shortfalls, take corrective action as required.


5. Ensure on-time, on-budget delivery of piping design and facility 3D model to generate construction work packages.


6. Lead design reviews (30%,60%,90) with Client and design engineering contractors.


7. Managing and reviewing the engineering work packages associated with all deliverable and time-based functions to ensure that budgets and schedules are being met, and take corrective action if necessary.


8. Accountable for Organized & timely issuance of engineering drawings and technical documents for Inter-Discipline Checks (IDC’s) & coordination for integration of inputs.


9. Reviews & Approval of vendor drawings, documents.


10. Ensure compliance with the company’s ISO Quality procedures and QMS guidelines. Coordinate Internal and Client audit requests, facilitate audit procedures for piping.


Work Experience (Employment History)

Experience as Advance Mechanical Design Engineer

  • Employer

    Honeywell UOP

  • From

    30 October 2017

  • To

    11 September 2023

  • Detail

     Working as piping technical lead and PSA project specialist for Hydrogen PSA projects.
     Responsible for releasing RFQ to final module shipment, managing all activities related to
    piping and structure.
     Coordinating with design engineering contractors, Fabricators, Valve vendors.
     Conducting 3D model reviews with the client ensuring compliance to all applicable client
    specifications, industry standards applicable.
     Participating in KOM, PIMs with vendors, clients, performing all inspection activities for
    piping and structures.
     Managing and reviewing the engineering work packages associated with all deliverable
    and time-based functions to ensure that budgets and schedules are being met, and take
    corrective action if necessary.
    Proposal Support
     Review the ITT (Invitation to Tender) documents provided in the proposals. Prepare
    technical queries (TQs) to the Client for scope clarification.
     Work closely with the proposal management team to support new bidding opportunities
    timely & efficiently.
    Engineering
     Accountable for Organized & timely issuance of engineering drawings and technical
    documents for Inter-Discipline Checks (IDC’s) & coordination for integration of inputs.
     Lead design reviews (30%,60%,90) with Client and design engineering contractors.
     Reviews & Approval of vendor drawings, documents, design calculations.
     Ensure compliance with the company’s ISO Quality procedures and QMS guidelines.
    Coordinate Internal and Client audit requests, facilitate audit procedures for piping.
     Participate in preparation and implementation of standard design guides, specifications,
    data-sheets and checklists as required.
     Managing electronic data handover to customers with the help of contractors/DCs.
     Preparation of PMS, VDS, Special item data-sheets.
     Coordinate Material Take-off (MTO) activities, identify irregularities, discrepancies, and
    shortfalls, take corrective action as required.
     Oversee the set-up of the Material Management system, incorporating the project
    specifications. Coordinate and incorporate the MTO from the 3D model. Update and
    maintain the system to incorporate the latest material requirements.
     Interface with Client representatives as required for resolving any technical issues.
     Promote and maintain the application of ethical and professional practices in the
    execution of engineering work.
     Support on-site piping construction for technical issues and providing resolution
    suggestion
     Ensure on-time, on-budget delivery of piping design and facility 3D model to generate
    construction work packages.
     Prepare a list of engineering deliverables and time-based functions to facilitate the
    planning and control of the engineering budget.
     Procurement, Fabrication & Inspection
     Lead Inquiry Requisitions to Valve vendors & Fabricators.
     Handle all TQs with all vendors on board till award.
     Manage & release Technical Bid Evaluations (TBE).
     Prepare Purchase Requisitions.
     Leading KOM with valve vendors, fabricators, technical discussions.
     Tracking schedules, resolving technical queries with regular meetings/shop visits and
    Follow up till final deliveries from vendors.
     Schedule & inspect final modules for correctness & responsible for skid checkouts.

Experience as Piping Engineer

  • Employer

    Fluor

  • From

    16 March 2017

  • To

    29 September 2017

  • Detail

     Worked as Quality Auditor. Random checking of Piping documents.
     Yellow line auditing of final Isometrics.

Experience as Asst. Lead Engineer - Piping

  • Employer

    Air Liquide Global E&C Solutions India Lttd.

  • From

    11 December 2010

  • To

    15 March 2017

  • Detail

     Layout Study, Preparation & Plot Plan development.
     Pumps, Exchangers, Column, compressor, Air Cooler, etc Piping.
     Piping study of Pipe rack.
     Checking / Commenting of Equipment Vendor Drawings.
     Preparing Nozzle Orientation of Equipments.
     Preparation of bulk MTO from P&ID.
     Conceptualization of Platform Requirements for Equipments.
     Equipment and Piping Modeling in PDS & SP3D.
     Supporting, clash checking and modification of lines as per stress analysis
     requirement.
     Checking of Piping Isometrics and resolving modeling errors in PDS & SP3D.
     Review & Checking of IDC documents.
     Interdisciplinary Co-ordination with internal & external Teams.
     Model Reviews with clients.

Experience as Manager - Piping

  • Employer

    Reliance

  • From

    10 June 2006

  • To

    10 December 2008

  • Detail

     Layout study, preparation and updating Plot plan using PDS.
     Preparing piping bulk MTO & Releasing Nozzle Summary report
     Equipment modeling and piping modeling of Pumps, utility system piping using PDS.
     Extraction of isometrics and resolving of modeling errors in PDS.
     Review & checking of Interdisciplinary design drawings and yellow line audits
     Exposure to site conditions & activities, resolution of site queries and SERs.
     Releasing stress package for analysis & Clash checking for piping with structures
     Construction/operations site query resolution & co-ordination with Project/Planning
     Involved in Pre and Post commissioning activities like battery limit interface checking.
     Plant Start up request, SER, DCN and as built in model.

Academic Qualification

Bachelor 01 June 2006

B.Tech, Mechanical Engineering
Certifications
Recommend Pooja Tiwari
Related UserList of Members
Mentor
Not yet Assigned
Profile Answers
Related Professionals
Profession: Pipeline Engineering
Current City: London

Profession:
Current City:

Profession: Mechanical Field Engineer
Current City: Baghdad

Profession: Engineering
Current City: Tirunelveli

Profession: QHSE
Current City:

Profession: Senior Accountant
Current City: Fujairah