ZEESHAN TAHIR

MEP MANAGER
LAHORE


Profile Views 18

Recommendations (0)
Last Seen: 20 September 2024 2:50 PM

Skills
8- MS Word Preparation of proposals & reports Facilities management Project cost estimation Reviewing technical submittals Design Review and Analysis Rate Analyses of equipment Generating Comparison sheets of technical items
  • Experience
    More than 15 Years
  • U.A.E Experience
    Fresh
  • Industry
    Engineering
  • Nationality
    Pakistani
  • Visa status
    Not Applicable
  • Qualification
    Bachelor - B.sc Mechanical Engineering
  • Driving License: Nil
Other Matching Titles/Position
MEP MANAGER
SENIOR MECHANICAL ENGINEER
FACILITIES MANAGER
CONSTRUCTION MANAGER
DIRECTOR MEP
Industry Titles
Engineering
Facility Management
Contracting /Construction

Summary of Career

1. One who is committed to the highest standards of excellence and integrity having 21 years of experience with inspection and executing cost-effective construction designs adhering to applicable building codes by supporting key technical initiatives, driving sustainable growth, and maintaining managerial leadership. Excels at building and retaining high-performance teams; spearheading installation and commissioning of the latest electromechanical systems in accordance with modern specifications an


2. Supervision of the MEP system for the Pakistan Expo Centre Lahore including the Operation and Maintenance, testing and commissioning of 3000 Ton HVAC system, 5 MW power house with the operations of the entire lighting and electrification network, ensuring efficient energy distribution, safety, and seamless output. Coordinated with utility services, including water supply, drainage, and fire protection systems, to ensure reliable operation. Leading the operations of high-capacity chillers, coolin


3. Successfully guided the contract completion process of both Construction packages, with the effective coordination of the Contractor and consultant. Also witnessed all the work done on the punch list and reviewed the variation orders, claims, and escalation of the contractor in light of the contract. Finally, the project was completed officially with good manners after verification of the final bill and approved dues to be paid to the contractor.


4. Monitored the large project of Expansion of Allama Iqbal International Airport, Lahore, and attain the goal of the project timeline by ensuring the compliance of technical and strategic support. Meanwhile, trained the client employees about the installed latest electromechanical systems (i.e., Parking Management System, Firefighting System, Fire Alarm System, Under Vehicle Surveillance system, CCTV Camera System, Public Address System, HVAC / ventilation system).


5. Supervised the completion of Landside buildings at Islamabad International airport related to the Public Sector Development Project and resolved technical & financial disputes successfully using effective coordination with all stakeholders regarding Aviation Building, Custom Building, and Cargo Building in the presence of the client and achieved the project timeline.


6. Demonstrated design issues and requirements in the light of construction drawings and project specifications as approved by design consultant: NESPAK-ADPi France at the Islamabad International airport Project. Consequently, I streamlined decisions through effective accountability to improve work progress and successfully performed the testing & Commissioning of Electromechanical Systems, Sewage Treatment Plant, and infrastructure.


7. Designed and developed a human powered vehicle for participation in International Mechanical Engineering Convention, HPVC contest at Ghulam Ishaq Khan (GIK) Institute Swabi and won first prize.


8. “Simulation of Heating and cooling system using Geothermal Energy.” Heating and cooling of buildings are widely being attained using different systems. The utilization of Geothermal energy to reduce heating and cooling needs in buildings has received increasing attention during the last years.To predict the performance under various conditions a parametric analysis was carried out to investigate the effect of pipe radius, pipe length, air mass flow rate, pipe depth, etc.


9. One Year Certificate Course in Mechanical Draftsman / 1999-2000 Government Technical Training Centre, D.I.Khan-Pakistan.


10. On site, field working exposure and Facilities management


Work Experience (Employment History)
Academic Qualification

Intermediate 27 September 2001

Diploma Associates Engineer (Mechanical)

Bachelor 14 September 2012

B.sc Mechanical Engineering
Certifications

Certificate Course in Mechanical Draftsman

  • Duration
    1 Year
  • Description
    One Year Certificate Course in Mechanical Draftsman
Recommend ZEESHAN TAHIR
Related UserList of Members
Mentor
Not yet Assigned
Profile Answers
Related Professionals
Profession: Electrical Engineer
Current City: Karachi

Profession: Sales Engineer
Current City: Dubai

Profession:
Current City:

Profession: Site Civil Engineer
Current City: Dubai

Profession: Electrical & Instrumentation Engineer
Current City: Islamabad

Profession: Material Specialist
Current City: Abu Dhabi