Poojan
IT EXECUTIVE
Gurgaon
Summary of Career
1. Description of Current project of Apco Infratech Pvt. Ltd. Construction of eight Lane divided carriageway starting at Sohna – Gurugram Road ( NH 248A) Near Alipur Village and ends at ch. 18+461 before the KMP Expressway ( Ch. 00+000 to Ch. 18+461) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Haryana PRESRENT TIME I AM WORKING IN APCO INFRATECH PRIVATE LIMITED AS A IT ASSISTANT OFFICER IN DELHI VARODARA EXERESSWAY PKG-1,
2. 2. IT EXECUTIVE (ASSISTANT OFFICER) APCO INFRATECH PVT. LTD. DOJ‐ 1 MAY‐2019 TO 10 June ‐2020 PROJECT DETAIL: Rishikesh‐Karanprayag Railway Tunnel Project Rishikesh, Uttarakhand Client:‐RVNL EPTISA CONSTRUCTION OF ADITS A1 (307m long), A2 (573m long) AND A3 (942m long) IN CONNECTION WITH NEW SINGLE LINE BROAD GAUGE LINK BETWEEN RISHIKESH AND KARANPRAYAG (125KM) IN THE STATE OF UTTARAKHAND, INDIA. PRESRENT TIME I AM WORKING IN APCO INFRATECH PRIVATE LIMITED AS A IT ASSISTANT OFFICER IN
3. NETWORK RF ENGINEER. MAKSAT TECHNOLOGIES PRIVATE LIMITED | DOJ‐7 MAY‐2018 TO 6 MAY-2019 PROJECT DETAIL: AIRTEL IWAN UP EAST. RF ENGINEER AT AMBEDKARNAGAR & FAIZABAD BHARTI-AIRTEL UP EAST LOCATION
4. No
5. No
6. No
7. No
8. No
9. No
10. No
Intermediate 25 May 2019
THREE years diploma in computer science and engineering from govt collage college.