shahid hafeez
MEP engineer
sharjah
Summary of Career
Experience as
30 October 2008
26 August 2014
• Prepared, executed & monitored testing and commissioning and operation and maintenance of water supply projects as per compliance with the plan, specification and schedule.
• Ensured time lines in schedule and maintaining the punch list of to-do and accomplished work.
• Developing the bill of Materials for the completion of works.
• Receive quotations, classify, compare and negotiate.
• Directly Associated with Post & Pre Installation works for water supply& Sewerage treatment plants equipment’s like pumps, motors, panel, valves and all other equipment involved in any MEP water supply projects.
• Assisted in the formulation, static implementation, monitoring and reporting of safety rules & standards in the project sites.
• Managed Material procurement, Sub contracts management. Sub contracts Agreement, Price negotiations.
• Involved in Quantity calculations for BOQ/Tender. Invoicing, Estimation, Engineering Estimates, Budgeting, Costing, Measurement of work, Extra Items with Rate analysis & Deviation.
• Designed and executed of laying maximum Diameter pumping lines including (MS, HDPE, CI GI) according to the specific design.
• Helped in preparing the annual budget with the concerned parties.
• Meet contractors and respond to their queries and provide them with the documents requirements.
• Reviewed the reports related to the inspection works carried out by the inspectors and make suggestions and recommendations to handle the problems and overcome difficulties and improve the work and submit them to the direct supervisor.
• Reviewed the case studies and reports regarding the violation of contractors, to issue the fines according to local laws.
• Coordinated with Senior Engineers of the inspection teams to inform about the customer complaints and regarding any matter could affect the safety of the users or the general view of the government
• Studied & coordinate the complaints received from the call center with the concerned departments until the complaints are closed.
• Performed other related duties and responsibilities associated with the position.
• Load Calculation of energy involved in water supply and water treatment projects.
• Perfectly engineered design using the latest engineering standards for developing water supply tube well drilling projects PC 1 and other MEP projects
Experience as
26 August 2014
30 November 2016
• Procured, Planned & executed and ensured mechanical, electrical installation and infrastructure developments as per approved drawing and material as per PPRA rules
• Executed the MEP project as per design and specification, pre commissioning, post commissioning and project handover.
• Supervised day to day site operations.
• Monitored consumption of material with respect to the ordered materials.
• Maintained a system of documentation of monitoring the productive of terms.
• Prepared, executed & monitored testing and commissioning of all systems like infrastructure developments, plumbing, (drainage, water supply, pumps & street lights with complete Electrical drawings as per compliance with the plan, shop drawing specifications, standards and schedule..
• Assisted the general manager in the preparing of tender documents PC 1.BOQ, engineering Estimates comparative statements final bills &Deviations.
• Coordinated and executed all the administrative work concerned with the Emergency team in terms of arranging meetings, preparing minutes of meetings and coordinate the recommendation to be executed.
• Prepared the periodical reports for campaigns throughout the year, as well as a compiled report at the end of each year summarizing all the campaigns details and assure record of those documents.
• Assisted in preparing documents required in section presentations and meeting of board of directors
• Prepared monthly and annual reports about the financial revenue of the section and to coordinate with financial team for submission and record of documents.
.
Experience as
01 January 2017
10 June 2017
• Prepares and submits master program of the project (Planning Package) in consultation with Project Manager. Review any comments from clients and get it approved from Client.
• Compile and prepare reports (weekly / monthly) in coordination with Project Manager and submit to the PMC / Client.
• Submits planning report such as preparation of manpower requirements of the project, preparation of material procurement reports in accordance with approved program.
• Coordinate with Project Manager the effective implementation and monitoring of Look Ahead-Schedule including the project actual accomplishments.
• Monitor Engineering submittals and procurement activities. Report to the Project Manager the status of project progress against the plan schedule and provides corrective actions necessary if the planned schedule is not achieved.
• Head in charge on of operation and maintenance of pumping station of water features ,Fountains, swimming pools, irrigation system and lighting system of Cornish parks and fire fighting systems of commercial buildings warehouses etc.
• Member of QA/QC wing for inspection tests reports, site observation reports and non clearance reports.
Bachelor 31 December 2007
mechanical engineer