Naveed Ali

Mechanical & Petroleum Engineer
Abu Dhabi


Profile Views 328

Recommendations (0)
Last Seen: 31 March 2020 3:13 PM

Skills
Material Inspection Welding Inspection DT & NDT EHS Presentation & Communication Report Writing Audit Rig & Wellhead Equipment Training Mud/Cement Rheological Modeling Drilling Operations
  • Experience
    13 Years
  • U.A.E Experience
    3 Years
  • Industry
    Oil , Gas & Energy
  • Nationality
    Pakistan
  • Visa status
    Employment Visa in UAE
  • Qualification
    Master - M.Sc. in Petroleum Engineering (Drilling & Production)- GPA 2.0, TU Clausthal, Germany
  • Driving License:
Other Matching Titles/Position
QAQC Engineer (Mechanical/Welding/NDT/Coating)
EHS & Quality Engineer
Rig/Drilling EHS/Q Coordinator, Supervisor
EHS /Technical Trainer
Industry Titles
Oil , Gas & Energy

Summary of Career

Achievements
Drilling Technology

- Formulate state of the art abrasive spacer & new experimental apparatus, Fangmann/TUC-GPA 1.3/90%, Germany


Wind Turbine

- Nominated as group leader for construction of wind turbine with UK team (Engr. without boarder).


Wellhead and EPC

- Nominated as project engineer & focal point by Saudi Aramco PMT for submission of 2 wellheads


Zubail Oil Field Development EPC Project

Independently managed on-site inspection of 75 flowline, oil transfer line, water trunkline, water injection lines


Work Experience (Employment History)

Experience as Lecturer

  • Employer

  • From

    01 May 2006

  • To

    31 May 2008

  • Detail

    Project: Renewable energy workshop: construction of homemade wind turbine with UK organization EWB
    - Delivered lectures of engineering mechanics, workshop technology, drawings & Auto CAD.
    - Design & demonstrate experiments, monitor students activities in mechanical workshop

Experience as QAQC Engineer Mechanical

  • Employer

  • From

    15 June 2008

  • To

    30 July 2010

  • Detail

    Project: Khuff Gas Project-wellhead & X-mas tree installation (Uthmania & Hawiyah)/Sour Gas wells ($110m)
    - Scope of Work: Construction of more than 16 Wellheads with HP gas wells having sour gas, flow-line hook up with X-Mas tree and oil transfer lines (24” & 36”) as per Saudi Aramco Standards.
    - Witnessed PMI, ferrite check, material inspection for spec, dimension & condition such as pipes, fittings, valves.
    - Witness Weld Inspection including join fit-up, Pre, in‒process & post weld as per Aramco checklist
    - Coordination with NDT crew for carrying-out of weld NDT inspection, monitor RT backlog & review NDE reports.
    - Monitored welder qualification test, issue certificates as per ASME IX, API 1104, AWS D1.1 and control repair rate.
    - Monitored heat treatment of W/H spools, review PWHT reports & hardness test of piping spools & fittings.
    - Carried out internal audit, identified areas of improvement, recommendation/corrective action & managed NCRs.
    - Reports: Preparing reports such as daily fit-up, weld visual/production, NDT, coating/painting, NCR, registers etc.
    - Managed equipment calibration and certificates (welding machines, P/T gages, inspection tools etc.).
    - Prepared test pack, monitor pigging, filling, pressure testing, leak testing, dewatering & final re-instatement.
    - Pre-commissioning of piping/pipeline & clearance of punch-list items during walk downs for start-up & operations.
    - Performed inspection, testing & installation of Xmas tree, valve, flanges, adaptors, wellhead piping spools, valves, cross country pipeline, Ensured FAT are done & accepted as per Aramco Engg Standard.

Experience as Lab Assistant/Master Thesis student (mud/cementing lab)

  • Employer

  • From

    01 November 2011

  • To

    28 February 2012

  • Detail

    Project: Investigation on filter cake erosion with state-of-the-art abrasive spacer employing newly developed experimental approach.

Experience as QAQC Coordinator/ Engineer

  • Employer

  • From

    09 April 2013

  • To

    20 May 2015

  • Detail

    Project: Zubair Oil Field Development ($ 359m)
    - Scope of Work: Execute construction & commissioning of 75 oil wells, wellheads & DGS plant, flow-line (6” & 8”), pipeline/oil transfer lines (18”, 24”, 36” & 52”), Water Trunk lines (10”, 16”, 24”).
    - Reviewed engineering drawings (Isometrics, as built drawing, red line mark-up, P & IDs) and ensured that all activities are carried out as per approved drawing and correct material is used.
    - Led line inspectors team, assigning tasks & site allocation on daily basis, provide guidelines and on-site monitoring to ensure construction activities are executed in compliance with project specification, with quality and safety.
    - Surveillance of materials storage, handling, dimension check, MTC/FAT, traceability & review of vendor document.
    - PIPELINE: Performed range of pipeline (OFL, OTL & WIL) inspection activities such as pipe stringing, welding, NDT, field joint coating, hydrostatic testing and pre-commissioning activities.
    - Piping & Structural fabrication: Monitored erection and fabrication of  wellhead & DGS piping, fabrication & structural works (support, well guard/platform, skids, anchors, launcher & receiver).
    - Define joints identification system, monitor join fit-up & inspection of pre, in-process & post welding.
    - Golden Tie-Ins Inspection ensured final golden tie-in is aligned with wellhead, piping/plant without stresses, inspection of joint fit-up, Pre, in‒process & post weld, coordinate NDT for bevel, root/hot passes & full weld.
    - Tank Fabrication: fit-up & inspection of shell/vertical/bottom joints, peaking, bending & plumpness (API 650/653)
    - Coordinated NDT activities, assessment of NDT results and monitor heat treatment of piping spools.
    - Coating & Painting: Inspection of paint & insulation systems, surface preparation (SSPC), abrasive material & blasting, WFT/DFT inspection, HSS installation (Canusa procedure) & holiday testing.
    - Reports: Prepared project quality procedures & audits documents, technical reports, WPS/PQR, pipe/bend report, welding report, weld map/log, NDT report, PWHT, hardness test report, coating report, RFI/WQT/NCR registers.
    - Performed verification & validation of the calibration certification of welding machine & equipment.
    - Control on NCR and root cause analysis for corrective/preventive action, follow up corrective action and close out.
    - Test Pack Preparation: reviewed of test pack, drawing, survey reports, welding/NDT reports, coating/painting & holiday test/lowering reports and test equipment certificates (gages, valves, manifold etc.).
    - Pressure Testing: Witnessed line cleaning, gauging, pigging, filling, pressurization (pressure/leak test), stabilization, de-watering, drying as per client spec./API/ASME code and ensured pressure test reports are released.
    - Walk downs & mechanical clearance of all punch list items during pre-commissioning & re-instatement

Experience as Q/EHS Coordinator (Drilling Operations)

  • Employer

  • From

    15 November 2015

  • To

    31 October 2017

  • Detail

    Project: Hire of 3 x 1500 HP Onshore Drilling Rigs ($ 100m)
    - Scope of Work: Worked on Greatwall land rigs GW-65, GW-75 & GW-164 with 1500 HP on ADNOC fields (Buhasa, Shah & Qusahwira) with HP (3000 psi) & 5-35% H2S, successfully drilled 25 deviated wells
    - Managing Contracts: Reviewed technical, contractual & commercial issues, master contract, sub-contractor pre-qualification, quotation, cost analysis, compiling contract/vendor list, invoice register & monitor daily drilling costs
    - Rigs Pre-startup Audits: performed detail inspection (Cat: I-IV) of 3 rigs in compliance with ADNOC/API requirements, prepared audit report & execute actions on outstanding items for rig acceptance.
    - Inspection of Drilling Rigs: carried out inspection(visual, dimensional, NDE) of Derrick structures, crown & travelling blocks, hooks, swivel, TDS (11SA), draw-works, hoisting equipment, elevators & mud pump per API Std.
    - Ensured all rig site lifting equipment & accessories (rope, slings, shackles, eye etc.) are inspected & maintained.
    - Equipment Maintenance: Coordinated equipment maintenance, overhaul & repair such as mud pump, draw-works, TDS, crown block, well control equipment, choke, tool joint, firefighting unit, generator, compressors etc.
    - Drilling Operations: assisted Operation & rig manager in day-to-day drilling operations as per drilling program including risk assessment, provision of resources, rig acceptance & resume drilling activities.
    - Reviewed potential risks outlined in well program, communicate with rig crew in operation meeting and ensured implementation of appropriate controls against all risks in the well operations.
    - Reports: Prepared DDRs, Weekly DTM Report & Operations Summary, Weekly & monthly Fuel Report, work orders, Equipment inspection report, performance benchmarking, risk register and project EHS.
    - Attended meetings including client weekly EHS, rig inspection, rig move, daily operations & contractor.

Experience as Freelance Trainer and Consultant (Technical/EHS)

  • Employer

  • From

    01 January 2018

  • To

    04 October 2018

  • Detail

    Project: Conduct QMS 9001 Gap analysis study of Dolphin Energy UAE for ISO certification
    - Carried out Quality & EHS audits of vender/suppliers/sub-contractors; provide recommendations & action plan
    - Delivered mandatory EHS trainings to ADNOC’s sub-contractors operational workforce such as H2S & EEBA (API49), confined space, risk assessment, firefighting, scaffolding, lifting operation etc.
    - Carried out pre-course preparation, pre & post questionnaires and final assessments as required.
    - Developed training programs for short & long-term management of competence assurance with focus on field-based workforce, facilitates training sessions and the implementation of programs.
    - Reviewed & evaluated training modules, processes, practices, identify areas of improvement & prepare action plan
    - Oversees the training for all contracts including the delivery, scheduling, resourcing & recording of internal/ external training. Assist management for the suitability, availability & cost of training
    - Managed external relationships with preferred suppliers for external training and ensures cost value is achieved and billing processes are effective

Experience as Sr. QAQC Engr/Coordinator/Welding Inspector

  • Employer

  • From

    05 October 2018

  • To

    28 February 2020

  • Detail

    Project: Water Injection Network Installation, Wells hookup and PPG Inter-connections (raw gas) (80 $ m)
    - Handled technical/engineering queries during construction, testing & commissioning of the project.
    - Prepared and reviewed documents such as client/ENI specifications, procedures, method statements, P & IDs, Isometric drawings, red mark-up, ITP, WPS/PQR/WQT etc. for wellhead, piping, structure and pipeline.
    - Reviewed hot tapping procedure, WPS/PQR & monitored on site execution in compliance with API 2201/1104
    - Material Inspection: assured all equipment, service tool, spare parts & material are complying with client specs., drawing, dimensional check, deployed on location, ready to use & function fit prior to beginning each job.
    - Performed inspection of wellhead/DGS including fabrication, installation & testing of piping spools, valves, fittings & ensure erection/assembly of equipment, piping & its final hookup with X-Mas tree & at production facility (API 6A).
    - Monitored pre, in-process & post welding & fabrication in subcontractor/vendor facility/workshop & at field
    - Consumable storage: ensured electrodes are stored & handled properly and backed if required
    - Coordinate & facilitate on site NDT activities including joints identification, verification & NDT methods/technique.
    - Witnessed qualification test, inspection of equipment, blasting, painting/coating activities for equipment, piping, structure, pipelines & ensured that surface & WFT/DFT comply with spec. Prepared painting/coating reports
    - Conducted frequent audits and inspections to ensure the effectiveness of QHSE programs & procedures at assigned location; provide recommendations for improvement & follow-up their implementation
    - Witnessed alignment of piping, valves, flanges & fittings, hydrostatic/leak tightness test & N2 purging in system.
    - Conducted field walk downs of finished work orders for verification & sign off punch list items
    - Prepare & review mechanical completion dossier & coordinate with all departments for documents
    - Built effective relationships with client & subcontractor that reflect & support core company values.

Academic Qualification

Master 12 March 2013

M.Sc. in Petroleum Engineering (Drilling & Production)- GPA 2.0, TU Clausthal, Germany

Bachelor 30 March 2006

B.Sc. in Mechanical Engineering, Engineering University Peshawar, Pakistan
Certifications
Recommend Naveed Ali
Related UserList of Members
Mentor
Not yet Assigned
Profile Answers
Related Professionals
Profession: mechanical technician
Current City: 0

Profession: Sales and Management
Current City: Ajman

Profession: Forklift & Crane Operator
Current City: Sharjah

Profession: Engineer
Current City: 0

Profession: CHEMICAL ENGINEER
Current City: Abu Dhabi

Profession: Tank Construction/Maintenance Engineer
Current City: