Nishad Muhammed
Planning Engineer
Kochi
Summary of Career
1. • Planning Engineer with nearly 15 of experience in Project Management, Construction Management, Contract Management and Strategic Planning
2. • A strategic planner with expertise in planning and scheduling construction projects with a flair for adopting modern construction methodologies; complying with quality standards
3. • Played a pivotal role in directing the activities for projects such as Construction of 6 Nos. Elevated Water Service Reservoirs (AWWA 100), 7 Nos. Ground Storage Tanks (API 650), Pipelines Hidd Installation Works (17.35Km), Pipelines East Installation Works (22.425Km) and Saudi International Petrochemicals Maintenance project
4. • Resourceful in liaising with clients, consultants, contractors, subcontractors & external agencies for determining the approvals and obtaining statutory clearances
5. • Successfully managed multiple projects and milestones while ensuring projects complied with all cost and scope specifications
6. • Strong organizer, motivator, team player and a decisive leader with successful track record in leading from original concept through implementation to manage diverse market dynamics
7. • Provinding the entire gamut of construction activities including providing technical inputs for methodologies of construction & in coordination with site management activities
8. • Leading and motivating large teams of workers & professionals and dealing with the allocation of tasks within teams based on skills profile
9. • Administering project activities and managing the complete project management cycle entailing requirement gathering and final execution of projects
10. • Finalizing requirements & specifications in consultation with engineering consultants/ collaborators, external suppliers, contractors & clients
Experience as Planning Engineer
14 January 2013
31 December 2019
Title: Construction of 6 Nos. Elevated Water Service Reservoirs (AWWA 100)
Client: Ministry of Electricity &Water, Bahrain
Title: Break tank No.2 floor repair, roof replacement, tank interior & exterior painting at SPWS (Maintenance Project)
Client: Ministry of Electricity &Water, Bahrain
Title: Maintenance and recoating of WTD Water tanks at West Riffa, Bahrain (Maintenance Project)
Client: Ministry of Electricity &Water, Bahrain
Title: Pipelines Hidd Installation Works (17.35Km)
Client: Ministry of Electricity & Water, Bahrain
Title: Pipelines East Installation Works (22.425Km)
Client: Ministry of Electricity & Water, Bahrain
Role:
• Led the preparation of:
o Initial & detail planning and execution plans
o Master schedule with resources and bill of quantity breakdown
• Synchronized with client, line management and other departments for project implementation
• Administering the overall progress at each and every stage of the project by using project management tools
• Formulated the master schedule integrating work breakdown structure (WBS) by communicating with Panorama and its contractors
• Assessed the allocation of resources and suggested ways for preserving essential progress
• Formed progress report on a Daily, Weekly & Monthly basis
• Prepared the documents for client / consultant meeting; attended the same along with the project manager
• Created and executed the planned against actual progress charts by means of Histograms, S curves, reports and analyses deviation from plan
• Evaluated and examined the breakdowns between the planned and actual progress; observed and highlighted the area of concern that needed help of the associate
• Preserved the updated status of the materials purchased
• Prepared Invoice (progress billing) and performed evaluation of subcontractors invoices
• Ensured accessibility of subcontractors resources in time along with quality to meet the desired indicators
• Administered the sub-Contract of the material & services according to the requirement of the projects
Experience as Planning Engineer
20 September 2010
22 November 2012
Title: Construction of 5MG 7Nos: Water Tanks (API 650) at Hamad Town
Client: Ministry of Electricity & Water, Bahrain
Role:
• Steered the formulation of master schedule along with planning for resources and budget
• Prepared the Progress Invoice with all other subsidiary documents
• Performed assessment of the subcontractors invoice
• Played a key role in preparing:
o Project plans, daily, progress reports on a weekly and monthly basis
o Look ahead programs, S-Curve and Cash flow
o Procurement and document register
o Retrieval plan at the time of delay
• Conducted progress review meeting on weekly basis at the unit level
Experience as Planning Engineer
15 October 2008
29 July 2010
Title: Saudi International Petrochemicals Maintenance project (SIPCHEM)
Role:
• Created plans for fabrication of pipeline, from P& ID, materials specification, cost analysis, histograms, S curve, construction program with primavera and isometric drawings
• Acted as a Quality Assurance Coordinator for administering the shutdown activities
• Safeguarded that proper QA procedures were adhered to during shutdown
Experience as Planning Engineer
06 February 2006
15 August 2008
Title: Water Treatment Plant at Sohar, STP at Buraimi, Southern Expressway – Utilities and Airport at Qarnalam
Role:
• Formulated the Master programme with the help of Primavera, Turnaround Document, Manpower Histogram and S-Curve
• Performed the assessment of the project by administering the outlays
• Ensured adherence to quality norms for all the projects
• Managed the resources for the projects
Experience as Mechanical Engineer
15 December 2003
30 December 2005
Role:
• Administered planning and execution of maintenance activities of various types of pumps, compressors, fans, centrifuges, mixing mill, valves condensers, etc.
• Managed estimation of type, quantity quality of maintenance.
• Instrumental in planning and identifying the most economical way of doing work, how and where the work would be done (Depending up on location of engine, the usage operating time).
• Efficiently handled:
o Requirement control of material and tools.
o Assignment of work
Bachelor 21 August 2003
B.Tech Mechanical from Cochin Univerisity of Science And Technology .Cochin ,India