SHAMMY BHADRAN
CIVIL ENGINEER
DUBAI
Summary of Career
1. Planning and organizing
2. Leadership: Influencing, negotiating and delegating abilities
3. Handling Project independently under pressure to deliver on time.
4. Promoting the highest standards of safety onsite at all times
5. Assessing the environmental impact and risks connected to projects
6. CO ORDINATE WITH THE PLANNING DEPARTMENT TO ENSURE MILE STONE DATES ARE UNDERSTOOD FOR EACH TURN OVER AREA
7. PREPARATION OF DOCUMENTS SUCH AS MATERIAL AND DRAWING TRACKING SCHEDULES SUBMITTALS
8. RESPONSIBLE FOR THE MOBILIZATION, SUCCESSFUL EXECUTION AND HANDING OVER OF THE PROJECT
9. PROJECT DOCUMENTATION WORKS: DAILY PROGRESS REPORTS, PROGRESS TRACKER WRT MILESTONE AND BASELINE, CASH FLOW MONITORING, LABOUR RATE ANALYSIS.
10. COORDINATION WITH DESIGN TEAM FOR SITE ISSUES MAKING SURE OF ALL DETAILS NEEDED FOR EXECUTION AND PRODUCTION PROCESSES
Experience as Site Engineer
04 March 2009
16 June 2010
PROJECT 1 : ISRO PROJECT IN VALIYMALA , NEDUMANGADU ,TRIVANDRUM –INDIA
IT COMPRISES OF 2BASEMENTS+GROUND +3 FLOORS, IT HAS 110 CAR PARKS, WELCOMING WITH GRAND DOUBLE HEIGHT RECEPTION AND ENTRANCE, HAVING 2 TYPICAL FLOOR LEVELS WITH 200SQM FLOOR PLATE AREA EACH WITH TWO TOILET BANKS, 2AHUS,2 ELEC ROOMS, 4PASSENGER LIFTS AND 1 SERVICE LIFT. HEIGHT OF THE BUILDING IS 18.5M FROM THE PODIUM LEVEL.
VALUE OF THE PROJECT: INR 70 CRORES
CLIENT : ISRO
PROJECT 2 : RESIDENTIAL BUILDING PROJECT IN TRIVANDRUM & KOLLAM.
ROLES AND RESPONSIBILITIES
STRUCTURE, FINISHES AND HANDING OVER OF THE BUILDING.
MANAGING PARTS OF CONSTRUCTION PROJECTS.
OVERSEEING BUILDING WORK.
UNDERTAKING SURVEYS.
SETTING OUT SITES AND ORGANISING FACILITIES.
SUPERVISING CONTRACTED STAFF.
CHECKING AND PREPARING SITE REPORTS, DESIGNS AND DRAWINGS.
PROVIDING TECHNICAL ADVICE & PROBLEM SOLVING.
ENSURING SITE SAFETY.
MANAGING THE STAFF EFFORTS AND RESOURCES ASSIGNED TO THE PROJECT.
INVOICING AND BILLING FOR THE PROJECT.
COORDINATION WITH PERMITTING AGENCIES.
CLIENT CONTACT AND COORDINATION.
Experience as CivilEngineer
09 January 2020
12 December 2013
PROJECT 1 : MULTI STORY FLAT – SREEDHANYA APEX VELLAYAMBALAM ,TRIVANDRUM –KERALA -INDIA
IT COMPRISES OF 2B + 2 FLOOR SHOPPING MALL + 17 TH FLOOR APARTMENT 17 NOS OF LUXURY APARTMENT. 3 BHK APARTMENT IN TRIVANDRUM CENTRAL ARE AVAILABLE FROM 1495 SQ. FT TO 2155 SQ.FT .THIS PROJECT HOSTS AMENITIES LIKE GYMNASIUM ,ROOF TOP PARTY AREA ,RECREATION HALL ETC .
VALUE OF THE PROJECT : INR 75 CRORES
CLIENT:SREEDHANYA HOMES
ROLES AND RESPONSIBILITIES
STRUCTURE AND FINISHES SUPERVISING FULL PROJECTS: INCLUDING IN HOUSE AND SUB-CONTRACTORS.
ATTENDING MEETINGS AND COMPETENTLY COMMUNICATE WITH CLIENTS, CONTRACTORS AND MAJOR ASSET OWNERS.
OVERSEEING WORKFORCE COMPRISING OF FOREMEN, CHARGE-HANDS, TECHNICIANS AND WORKERS & SITE COORDINATIONS& MAINTENCE OF DPR RECORDS.
SETTING OUT PROJECT WORKS IN ACCORDANCE WITH DRAWINGS & SPECIFICATION.
ENSURING THAT ALL ASSIGNED WORK IS COMPLETED ON TIME AND WITHIN AGREED BUDGETS.
GIVING STATUS AND HIGHLIGHTING SITE ISSUE STATUS TO TOP MANAGEMENTFOR MONTHLY MEETINGS.
FOLLOW UPS WITH MATERIAL SUPPLIERS FOR PROCUREMENT.
Experience as Project Engineer
10 July 2011
12 December 2012
PROJECT 1 : ASHGHAL PROJECT -SEWER EXTENSION AND HOUSE CONNECTION AT NEW SALATA- QATAR
THE WORK GENERALLY COMPRISES THE CONSTRUCTION OF SEWER DEEP MANHOLE, ROADS, INSPECTION CHAMBERS AND HOUSE CONNECTION AT AL NEW SALATA AREA
CONSTRUCTION OF 35 NOS DEEP MANHOLES 1.5& 1.8 M INTERNAL DIA. AND SHALLOW MANHOLE 1.2 M INTERNAL DIA. 98 NOS.
LAYING OF APPROXIMATELY 2560 M OF 300 MM AND 4250 M OF 200MM DIA . SEWER PIPE LINE A ASPHLAT ROADS.
CONSTRUCTION OF 267 NOS . SHALLOW CHAMBERS. 85 RAMPS & 8 LATERAL CONNECTIONS AND 84 NOS. DIRECT CONNECTION TO EXISTING MANHOLES.
VALUE OF THE PROJECT: QR – 270 MILLION
CLIENT : ASHGHAL
STRUCTURAL CONSULTANT : ASHGHAL – DRAINAGE DEPT.
PROJECT 2 : RESIDENTIAL 5 NOS VILLAS IN AL RAYYAN ( G +2 ) BUILDING – QATAR - DOHA
ROLES AND RESPONSIBILITIES
ENCOURAGING CONTINUOUS IMPROVEMENT THROUGH THE MEASUREMENT AND REPORTING OF THE KEY OPERATIONAL ASPECTS TO SENIOR MANAGER.
REGULAR MEETINGS WITH CLIENT AND CLIENT REPRESENTATIVES TO DISCUSS PROJECT PROGRESS.
PROVIDING SPECIALIST DIRECTION ON UNUSUAL OR DIFFICULT ENGINEERING ISSUES.
LIAISING WITH CLIENT REPRESENTATIVES, OTHER PROFESSIONALS WITHIN DESIGN TEAMS AND CONTRACTORS’ REPRESENTATIVES DURING CONSTRUCTION.
CARRYING OUT SITE VISITS AND SURVEYS.
MONITORING AND INSPECTING THE WORK OF SUB CONTRACTORS AND OTHER THIRD PARTIES.
ORDERING MACHINERY AND MATERIALS.
UNDERTAKING PERIODIC VALUATIONS ASSESS CONTRACTORS FINANCIAL CLAIMS AND PROCESS PAYMENTS TO CONTRACTOR THROUGH THE CLIENT’S ORGANIZATION.
UNDERTAKING SNAGGING INSPECTION ON PRATICAL COMPLETION OF THE WORKS AND MANAGE PROCESS TO RECTIFY ANY DEFECTS.
INSPECT AND ASSESS / MONITOR HEALTH AND SAFETY ON SITE.
CARRY OUT ANY REQUIRED SITE VISITS AND INSPECTIONS TO DETERMINE THE CIVIL ENGINEERING ASPECTS OF PLANNED WORK.
Experience as CivilEngineer
02 January 2014
10 April 2015
PROJECT 1 : CONSTRUCTION OF NEW FUEL OIL UPLOADING MARINE TERMINAL -JETTY -2 AT RABIGH POWER PLANT ,JEDDAH- KSA.
CONSTRUCTION OF NEW FUEL OIL UNLOADING MARINE TERMINAL JETTY -2 RABIGH POWER PLANT PROJECT CONSIST OF UNLOADING PLATFORM, CONNECTING DECK SLAB BRIDGES, ASPHALT ROAD , CONTROL BUILDING, PIPE SLEEPERS, MANHOLE AND DUCT BANK CONSTRUCTION. PIPE LINE OF ABOUT 2 KM AND CONNECTION TO THE EXISTING POWER PLANT. A JETTY FOR TANKERS FROM 20,000 TO 120,000 DWT, TO SUPPLY RABIGH POWER PLANT WITH CRUDE OIL AND A SMALL CRAFT BERTH FOR TUG BOATS AND PATROL VESSELS USED FORJETTY OFFSHORE CONSTRUCTION WORKS.
VALUE OF THE PROJECT :SAR 1.67 BILLION
CLIENT : SAUDI ELECTRICITY COMPANY
CONSULTANT: ILF CONSULTING ENGINEERS –KSA
ROLES AND RESPONSIBILITIES
EXECUTION OF SITE. (UNLOADING PLATFORM, CONNECTING BRIDGES , ROADS ,MANHOLES ,PIPE LINES)
ORGANIZING HUMAN AND MATERIAL RESOURCES ON SITE.
CO- ORDINATION WITH CONSULTANT FOR INSPECTIONS.
TAKING RESPONSIBILITY FOR HEALTH AND SAFETY ON SITE.
DELIVERING VARIOUS ENGINEERING RELATED PROJECTS FROM FEASIBILITY STAGE THROUGH TO DETAILED DESIGN AND SITE IMPLEMENTATION.
SELECTION SUITABLE EQUIPMENTS AND MATERIALS ACCORDING TO THE PROJECT SPECIFICATION.
MONITORING RESOURCES AND MAINTAINING PROGRESS AGAINST BUDGETS.
COST CONTROL: INCREASING AND TRACKING PRODUCTIVITY OF LABORS AND MACHINERY, MATERIAL WASTAGE CONTROL.
NEGOTIATING MODIFICATIONS WITH ARCHITECTS AND CONSULTING ENGINEERS.
ASSIST QS TO RAISE VARIATIONS TO CONTRACT.
Experience as Project Engineer
05 June 2015
20 January 2020
PROJECT 1 : W HOTELS AND ALEF RESIDENCES PROJECT, PALM JUMEIRAH, DUBAI, UAE
IT IS A MIXED USE RESIDENTIAL AND HOSPITALITY PROJECT ON THE PALM JUMEIRAH, DUBAI. PROPOSED WITH 75 LUXURIOUS RESIDENTIAL APARTMENTS AND 400 KEYS OF HOTEL GUEST SUITS. IT CONSISTS OF B+G+6 FLOORS
VALUE OF THE PROJECT : AED 2.5 BILLION
CLIENT : AL SHARQ INVESTMENTS
PMC : MACE INTERNATIONAL, DUBAI
ARCHITECTS : HOLFORDS/DWP
STRUCTURAL AND MEP CON : HYDER CONSULTING
LANDSCAPING CONSULTANT : LMS CONSULTING
PROJECT 2 : MADINAT JUMEIRAH RESORT PROJECT PHASE 4, DUBAI, UAE
MADINAT JUMEIRAH RESORT PHASE 4 - 75,000 TO 100,000M²,( G + 4 ) A FIVE STAR LUXURY WATERFRONT RESORT OPERATED BY LEADING HOTELIER JUMEIRAH AND DEVELOPED BY MIRAGE LEISURE AND DEVELOPMENT.
LOCATED IN DUBAI NEXT TO THE ICONIC BURJ AL ARAB HOTEL, THE MADINAT JUMEIRAH RESORT PHASE 4 DEVELOPMENT IS NOW UNDER WAY, MADINAT JUMEIRAH WILL INCREASE ITS ROOM CAPACITY BY AN ADDITIONAL 435 ROOMS. VALUE OF THE PROJECT : AED 770 MILLION
CLIENT : JUMEIRAH GROUP, DUBAI
PMC: MIRAGE LEISURE AND DEVELOPMENT-UAE
ARCHITECT: WOODS BAGOT DUBAI STUDIO-UAE
LANDSCAPE ARCHITECT : SOUTH AFRICAN NORTH POINT ARCHITECTS, DUBAI.
LOCAL CONSULTANT : ADC (ARCHITECTURAL DESIGN CONSULTANT), DUBAI.
STRUCTURAL CONSULTANT: AURECON, DUBAI
PROJECT 3 : THE WAVE TOYOTO SHOW ROOM , ABU DHABI, UAE
A G + 4 -STOREY WITH 3 BLOCKS BEING BUILT IN ABU DHABI. SHOW ROOM & WORK SHOP. IT HAS CAR WASH AND PARKING YARD. THE MAIN KEY POINTS OF PROJECT WERE STRENGTHENING OF STEEL STRUCTURE, DEMOLITION AND REBUILD OF INTERNAL PARTITIONS AND SUB-STRUCTURE, EXTENSION OF EXISTING BUILDING, PILING, UNDERGROUND TANKS.
VALUE OF THE PROJECT : AED 350 MILLION
CLIENT : TOYOTO AL FUTTAIM MOTORS
ARCHITECT : MAKAN
INTERIORS : MAKAN INTERIOR DESIGNS
ROLES AND RESPONSIBILITIES
CO ORDINATE WITH THE PLANNING DEPARTMENT TO ENSURE MILE STONE DATES ARE UNDERSTOOD FOR EACH TURN OVER AREA.
DELIVERING THE WORK ON TIME WITH QUALITY, SAFETY & SATISFYING THE CLIENT SATISFACTION.
COORDINATION WITH DESIGN TEAM FOR SITE ISSUES MAKING SURE OF ALL DETAILS NEEDED FOR EXECUTION AND PRODUCTION PROCESSES.
PROJECT DOCUMENTATION WORKS: DAILY PROGRESS REPORTS, PROGRESS TRACKER WRT MILESTONE AND BASELINE, CASH FLOW MONITORING, LABOUR RATE ANALYSIS.
RESPONSIBLE FOR THE MOBILIZATION, SUCCESSFUL EXECUTION AND HANDING OVER OF THE PROJECT.
COORDINATE WITH LANDLORD AND AUTHORITIES FOR BUILDING NOC, DRAWING APPROVAL, INSPECTION AND COMMISSIONING.
PREPARATION OF DOCUMENTS SUCH AS MATERIAL AND DRAWING TRACKING SCHEDULES SUBMITTALS.
CO ORDINATE WITH SUPPLIERS TO RECEIVE MATERIALS QUOTATIONS FOR TENDERING & PROJECTS.
SELECTION SUITABLE EQUIPMENTS AND MATERIALS ACCORDING TO THE PROJECT SPECIFICATION & STANDARDS.
PARTICIPATING IN THE PREPARATION OF PROJECT CONSTRUCTION SCHEDULE & WORK PLANS.
WEEKLY & MONTHLY PROGRESS MONITORING AND REPORTING.
DETAILED STUDY OF THE MEP CONSTRUCTION AND ARCHITECTURAL DRAWINGS AND SPECIFICATIONS
Bachelor 07 May 2008
• B.Tech in Civil Engineering from TKM College of Engineering University of Kerala , Kollam, Kerala . Passed With 1st Class ( 70 % ) in May 2008.Other 06 July 2005
• Diploma in Civil Engineering from SN Polytechnic College, Kottiyam , Kollam - Kerala . Passed with 1st class (74.3%) in April 2005.Matric 10 April 2002
• Plus Two passedfrom Sree Narayana Villasom Higher Secondary School,Varkala, Trivandrum – Kerala. Passed with 2nd class (55%) in March 2002Matric 06 July 2000
• SSLC Passed with 2ndclass(54%) from Nava Bharat High School -Attingal Trivandrum in March 2000.Matric 06 July 2000
• SSLC Passed with 2ndclass(54%) from Nava Bharat High School -Attingal Trivandrum in March 2000.