Muhammad shahzad afzal

Electrical qa/qc inspector
Lahore


Profile Views 243

Recommendations (0)

Skills
Seeking a challenging and rewarding opportunity in an organisation of repute which recognizes & utilizes my true potential while nurturing my analytical and technical skills in the field of quality control department.
  • Experience
    6 Years
  • U.A.E Experience
    --
  • Industry
    Contracting /Construction
  • Nationality
    Pakistani
  • Visa status
    Not Applicable
  • Qualification
    Bachelor - Bachelor of Technology in Electronics (Hons) from Preston university Lahore
  • Driving License: not
Other Matching Titles/Position
Industry Titles
Contracting /Construction

Summary of Career

Work Experience (Employment History)

Experience as QA/QC Electrical Engineer

  • Employer

  • From

    30 January 2017

  • To

    17 January 2019

  • Detail

    Project Specification :

    11 Underground Stations 6 Evacuation Shafts & 34.7 KM of Underground Tunnel.

    To make sure that work carried out as per latest Method statements, specifications and approved shop drawings.
    Reports to Site Manager and liaising with QA/QC Manager regarding the quality issues.
    Monitoring the inspections & testing and make sure, if it is conducted as per Standard & complying all the Project specifications
    Performing the site visit on the basis of inspection request and prepare and submit the inspection report to the Client Qatar Rail
    Coordinate with Contractor, Sub Contractors and Consultant and attend the various systems and equipment inspections.
    Keeping all the equipment’s and tools are duly inspected and calibrated used in the site
    Issuing NCR and SCAR if necessary.
    Maintaining logs for IRE, MIR, NCR, SCAR, calibration and for all other reports.
    Follow apply procedure of safety permit criteria of (Job of safety Analysis, Hot work permit, confined space permit).
    Inspection for PSAT and SAT of MD,SMDB and DB.
    During Testing & commissioning follow procedure of LOTO.
    Installation Inspection of lighting , small power , Cable containment, fire alarm system , FM 200 system , Aspiration system , Earthing and bonding, Lightning protection, SMDBs , DBs , MCCs , ATS, Lighting control panels .

Experience as QA/QC Electrical Engineer

  • Employer

  • From

    02 April 2014

  • To

    07 January 2015

  • Detail

    I am fully responsible for the execution, Inspection, testing, and monitoring the project as per schedule. I am proficient in handling a team of Supervisors and Workers, inter-discipline coordination, technical supports and project management consultancy.
    Ensure work is executed according to contract specifications, approved design drawings, agreed procedures, and method statements
    Interaction with the client on the work progress.
    Supervise and assist in inspections by the client.
    Supervise and conduct visual Inspection of the completed parts.
    Planning, resources management and reporting of daily tasks on hand.
    Installation, testing of GE 9E Gas Turbine skids.
    Installation of instruments (Pressure Transmitters, Pressure switches, Thermocouples, RTDs, Vibration sensors etc.)
    Installation Inspection of PEECC.
    Installation of Inspection Generator Circuit breaker (Alstom)
    Installation of Inspection isolator, lighting arrester, earthing equipment, battery and motor driving auxiliaries.
    Installation of Inspection Isolated phase bus duct (Alfa Standard)
    Installation of all Inspection electrical auxiliaries inside turbine acoustic enclosure.
    Cold loop testing, hot loop testing of field instruments.
    Installation Inspection of MV switchgear (ABB)
    Installation Inspectionof of LV switchgear (Cable Energy)
    Installation Inspection of DCS Panel (GE), Protection & Metering Panels (Schneider Electric)
    Installation Inspection of BSDG and Emergency Diesel Generator.
    Cable (LV, MV, HV and control) laying and meggering of cables of the entire power block.
    Installation Inspection of 400kV, 132kV GIS, (Hyosung).
    Installation CVT, insulators, line trap, gantries towers.
    Testing & Commissioning of control and relay Panels.Follow apply procedure of safety permit criteria of (Job of safety Analysis, Hot work permit, confined space permit)
    During Testing & commissioning follow procedure of LOTO.
    Installation of transformers:


    · 350 MVA Main Step up Transformer (Hyundai)
    · 6 MVA Unit Auxiliary Transformer (Hyundai)
    · 20 MVA Station Auxiliary Transformers (Iljin)
    · 2.0 MVA and 2.5 MVA Service Transformers (Iljin)

Experience as QA/QC Electrical Engineer

  • Employer

  • From

    01 February 2012

  • To

    31 March 2014

  • Detail

    Responsibilities: -

    Inspection of incoming materials.
    Implementation of project Quality Plan for the Electrical activities & Project specific procedures.
    Preparing of daily and weekly site progress report
    Internal Inspection of electrical installation
    Inspection of electrical installation with client
    Cable Tray Installation in Electrical Buildings.
    Cable Laying (MV, LV, Control, Instrument and Fiber Optic)
    Testing and meggering of cables and daily electrical tool inspection.
    Inspection Installation of Power and Distribution Transformers.
    Inspection Installation of 500KV Switchyard Electrical Equipment.
    Installation CVT, insulators, line trap, gantries towers.
    Testing & Commissioning of control and relay Panels.
    Follow apply procedure of safety permit criteria of (Job of safety Analysis, Hot work permit, confined space permit).

Experience as QC INSTRUMENT SUPERVISOR

  • Employer

  • From

    21 April 2010

  • To

    27 October 2010

  • Detail

    Responsibilities: -


    To complete the document pertinent to completion of dossier with the help of other departments.
    To collect the QA/QC documents from the concerning departments and make presentable shape for client.
    Verify the work has been carried out as per Client approved ITP’s, Project specifications, material submittal, method of statements, Qatar Construction Standards, Site coordination drawings & AFC drawings
    Implementing Quality control requirements on construction site mainly in the installation of Electrical systems, review and approval of Quality control procedures and inspection test plan.
    Plan & arrange quality control inspections for third party agencies for approvals.
    Review & monitor subcontractor’s work progress report.
    Inspection of material delivered to site in order to ensure compliance with project specification and approved material submittal.
    Assisting the testing & commissioning team.
    Inspect instrument and Power cable laying.
    Installation Inspections of field instruments e: g Flow Transmitter, Pressure Transmitter, Temperature Transmitter, Pressure/Level Gauge’s and Control Valve’s
    Conduct Cold and Hot Loop testing
    Conduct Process instrument tubing leak test on site according to approved procedures.
    Installation Inspection of cable tray along with supports and it’s earthing as pre-drawing.
    Installation of Pressure/Level Gauges, Temperature Transmitter as pre-drawing.
    Panel/Junction Box installation termination and it’s earthing as pre-drawing.

Experience as ELECTRICAL ENGINEER

  • Employer

  • From

    30 September 2009

  • To

    31 March 2010

  • Detail

    Responsibilities: -

    To complete the document pertinent to completion of dossier with the help of other departments.
    To collect the QA/QC documents from the concerning departments and make presentable shape for client.
    Verify the work has been carried out as per Client approved ITP’s, Project specifications, material submittal, method of statements, Qatar Construction Standards, Site coordination drawings & AFC drawings
    Implementing Quality control requirements on construction site mainly in the installation of Electrical systems, review and approval of Quality control procedures and inspection test plan.
    Plan & arrange quality control inspections for third party agencies for approvals.
    Review & monitor subcontractor’s work progress report.
    Inspection of material delivered to site in order to ensure compliance with project specification and approved material submittal.
    Assisting the testing & commissioning team.
    Inspect instrument and Power cable laying.
    Installation Inspections of field instruments e: g Flow Transmitter, Pressure Transmitter, Temperature Transmitter, Pressure/Level Gauge’s and Control Valve’s
    Conduct Cold and Hot Loop testing
    Conduct Process instrument tubing leak test on site according to approved procedures.
    Installation Inspection of cable tray along with supports and it’s earthing as pre-drawing.
    Installation of Pressure/Level Gauges, Temperature Transmitter as pre-drawing.
    Panel/Junction Box installation termination and it’s earthing as pre-drawing.

Academic Qualification

Matric 14 June 2003

Matric in science with B.I.S.E LAHORE

Intermediate 30 September 2006

3 years Diploma of Associate in Electronics Technology (P.B.T.E LAHORE BOARD)

Bachelor 30 September 2010

Bachelor of Technology in Electronics (Hons) from Preston university Lahore
Certifications
Recommend Muhammad shahzad afzal
Related UserList of Members
Mentor
Not yet Assigned
Profile Answers
Related Professionals
Profession: Business Development & Administration
Current City: Lahore

Profession: Pilling supervisor
Current City: Dubai

Profession: Bsc civil engineer
Current City: Abu dhabi

Profession: Lab Technician
Current City: Swabi

Profession: MECHANICAL ENGINEEER
Current City: sharjah

Profession: Quantity Surveyor/Estimator
Current City: Dubai