Aitezaz Ahsan
Electrical Engineer
Attock
Summary of Career
1. Developed new and innovative ideas for the upcoming smart products for the company
2. Design hardware and software of devices
3. Worked on the Vehicle’s On-Board Diagnostic Device
4. Prepare business plans for smart products
5. Manage all aspects involved in a product development process
6. Developed and secured approval of detailed business plan for the company’s current and upcoming smart devices
7. Worked on the automation project for NPPMCL power plant
8. Successfully implemented three product designs in the field of home automation systems which are in the production phase
9. Accomplished several goals as Research and Development leader for the past one year
10. Completed multiple circuit design layouts and led them to the production phase
Experience as Asst. Electronics Engineer
01 April 2019
01 November 2019
AMS Power & Industrial Engineering, an EPC company was established in 1962 and is serving since then. The company has helped me to achieve a higher level of professionalism as I am a part of its Research & Development department for smart and IoT based devices along with industrial automation.
Many of my key responsibilities in the department includes:
• Develop new and innovative ideas for the upcoming smart products for the company
• Research and develop the prototypes
• Design hardware and software of devices
• Design multi-layer PCB layouts
• Document the R&D data and prepare test cases for the devices
• Prepare business plans for smart products
• Manage all aspects involved in a product development process
During the above-mentioned period of time at my current position I have:
• Worked on the Vehicle’s On-Board Diagnostic Device
• Achieved approval for the four new smart products developing
• Completed troubleshooting of the current version of OBD-II device
• Worked on Amazon Web Services (AWS) Cloud platform
• Worked on Raspberry Pi platform
• Developed the four-layer PCB Layout design for updated version of OBD-II device
• Played a key role in development of updated version of the company’s product
• Helped to reduce production cost of the above-mentioned device
Experience as Product Design Engineer
01 May 2017
01 April 2019
During above mentioned duration, I have worked on three different projects as project lead along with several responsibilities including Hardware and Software design. These projects played a crucial role to enhance my technical skills along with my communication and project handling capabilities in an environment of teamwork. Working on different projects simultaneously has groomed my working attitude to achieve better results in different work situations. I have also developed the habit of listening and learning from my superiors. As a Product design engineer, I have:
• Successfully implemented three product designs in the field of home automation systems which are in the production
phase
• Improved the hardware along with software of the industrial three phase monitoring system
• Accomplished several goals as Research and Development leader for the past one year
• Successfully led three product ideas to the development stages as these products proved a promising future in the development of the organization
• Completed multiple circuit design layouts and led them to the production phase
• Successfully performed the assigned duties in procurement department
• Assured the quality of products from the start of production until the installation of the devices
• Worked on the NI’s Multisim simulator for the simulation and circuit designing purposes for the Variable Frequency Drive above-mentioned projects and to study I2C bus behavior under various communication purposes.
• Worked on Altium Designer to successfully create multilayer PCB Designs according to the industrial standards
• Worked on Visual Studio for C++ programming for the software development requirements of the Variable Frequency Drive and the above-mentioned projects
Matric 01 March 2011
Completion Year: 2011 Major subjects: Science Division: 1st Institution: Paramount Public High school Attock, PakistanIntermediate 01 March 2013
Completion Year: 2013 Major Subjects: Pre-Engineering Division: 1st Institution: Fauji Foundation College Attock, PakistanBachelor 01 September 2017
Completion Year: 2017 Discipline: Electrical Engineering (Electronics) Division: 1st Institution: Air University Islamabad, Pakistan