Nitin Adiyecha
Assistant Manager
---
Summary of Career
1. Responsible for generation of documents such as project plan, work breakdown structure, overall and detailed schedule, progress report and presentations during the stage of proposal and execution under the guidance of a project control manager.
2. To prepare L-2, L-3 schedule using software package such as Primavera and monitoring of project implementation.
3. Responsible for activities such as preparation of master schedule for engineering, procurement and construction with overall schedule, data collection for scheduling, schedule v/s actual progress, forecasting, trend analysis, resource planning.
4. Monitor critical path and overall schedule on daily basis by collecting necessary data for the same. Prepare catch-up plan, look ahead plans based on inputs from respective sources.
5. Prepare progress measurement procedure and carry out progress update on stipulated interval.
6. Preparation of manpower histogram, highlighting the resource constraints that affects the project progress.
7. Identify requirement of revision in schedule and prepare a revised schedule
8. Carry out quantity variance analysis.
9. Certify subcontractors invoices
10. Identify the critical activities in the project progress.