Ehtisham ul Haq

E&I Engineer
Sharjah


Profile Views 275

Recommendations (0)

Skills
Instrumentation Instrumentation Design Instrument Calculations Design Engineer Project Engineer Planning QC QA
  • Experience
    5 Years
  • U.A.E Experience
    --
  • Industry
    Engineering
  • Nationality
    Pakistani
  • Visa status
    Employment Visa in UAE
  • Qualification
    Bachelor - Electrical Engineering
  • Driving License:
Other Matching Titles/Position
Industry Titles
Engineering

Summary of Career

1. Prepare Schedules, Databases, Data sheets, Termination schedules, etc.


2. Prepare Layouts, Routing diagrams, Loop diagrams, Interconnection diagrams, Control Room Layouts, etc.


3. Calculations such as flow, level, temperature, pressure etc


4. Sizing of control valves, Safety relief valves, Flow metering, Orifice plates, etc. • Interlock & control logic diagrams


5. Cable Schedules, Junction Box drawings, Marshalling panel drawings


6. Design calculations for control valves and flow meterd using software like Instrucalc


7. Experience in handling all types of field instruments like Pressure, Flow, Level and Temperature Transmitters, Switches and Gauges, Control valves and safety valves.


8. Control of the site work schedule, process and quality through checks, reviews, inspection and testing and where appropriate, approval of work processes and equipment.


9. Capable of preparing reports and prepares studies on instrument facilities and has problem solving abilities.


10. preventive and corrective maintenance of control system and field equipment in the plant


Work Experience (Employment History)

Experience as Electrical Engineer

  • Employer

    the Industrial Entreprises Pvt. Ltd.

  • From

    15 September 2014

  • To

    09 February 2016

  • Detail

    Duties & Responsibilities:
    • Identifying the requirements and scope of work, review specifications, drawings and other documents of the project.
    • Assessment of the commissioning work involved and assess the available resources and possible constraints.
    • Ensure that all safety and precautionary requirements and procedures are followed during the commissioning.
    • Manage and supervise the electric and instrumentation commissioning activities at the site on a day-to-day basis.
    • Ensure that the commissioning plan includes information on materials, specific tools and vendor support to ensure an efficient and safe execution phase.
    • Provide the technical support to the instrument commissioning team in order to improve the work progress.
    • Reporting to the team leader on site as well as monitor the safety performance of all commissioning contractors on site.
    • Review plans, schedules and vendor/engineering documents in order to start the site activities.
    • In-charge for a team of instrument technicians during the commissioning and start up phase.
    • Identify tools and test equipment required for performing commissioning activities & prepare specification for procurement.
    • Making the daily/ weekly progress report and forward to the commissioning manager.
    • Coordinate with quality control department for improving the project quality.
    • Maintain PTW system for all instrumentation wok permits and assists in project closeout and punch-list issues.
    • Ensure the correct application of the project quality plan in site activities, the supervision/coordination of the quality control activities and implementation of the quality control plans.
    • On-site coordination of loop checks and functional checks.
    • Provide the technical guidance to the design draftsman in order to prepare the As-builts engineering drawings.
    • Frequently assess the subcontractors for their work and quality standards for them meeting the project specifications.
    • Monitoring the subcontractor for the safe execution of pre-comm activities in line with the schedule.
    • Be aware of cost monitoring, control expenses and report overruns to the management.

    Projects involved in TIE Workshop/Site

    • Erection and commissioning of 135 TPH High Pressure Steam generator in Layyah Sugar Mills.
    • Erection and commissioning of 20 TPH steam generator (65bar) in continental plastic, Lahore.
    • Erection and commissioning of 35 TPH Steam generator (65 bar) in best board, Gujranwala.
    • Erection and commissioning of 25 TPH Steam generator (65 bar) & boiler driven expansion turbine for Al-Rehman Gardens colony.

Experience as Engineer E&I

  • Employer

    Descon Engineering LLC

  • From

    05 September 2017

  • To

  • Detail

    Functional Responsibilities involved:
    • Prepare Schedules, Databases, Data sheets, Termination schedules, etc.
    • Prepare Layouts, Routing diagrams, Loop diagrams, Interconnection diagrams, Control Room Layouts, etc.
    • Prepare scopes of work, Request for quotation.
    • Review design documentation submitted by the vendors and evaluates vendor quotations.
    • Review of P&I Diagrams
    • Calculations such as flow, level, temperature, pressure etc
    • Sizing of control valves, Safety relief valves, Flow metering, Orifice plates, etc.
    • Interlock & control logic diagrams
    • Instrument Index and I/O’s lists for DCS/ESD
    • Technical specifications for all Instruments including DCS, ESD and PLC system based on the project specifications
    • Cable Schedules, Junction Box drawings, Marshalling panel drawings
    • Instrument Loop Diagrams
    • Instrument Hook up diagrams, Bill of Material
    • Design calculations for control valves and flow meterd using software like Instrucalc
    • Evaluation of Technical bids from various vendors including DCS & ESD vendors.
    • Reviewing vendor drawings and documents and system engineering for DCS/ESD systems.
    • Active participation in HAZOP.
    • Complete tasks in less than budgeted man hours.
    • Monthly Project status reports and statistics.
    • Project Review meeting and reports.
    • Various project cost estimates
    • Maintain positive relationship with all clients, consultant and partners
    • Experience in handling all types of field instruments like Pressure, Flow, Level and Temperature Transmitters, Switches and Gauges, Control valves and safety valves.
    • Loop checking of field instruments from field to DCS and vice versa. Trouble shooting of field instruments.
    • Control of the site work schedule, process and quality through checks, reviews, inspection and testing and where appropriate, approval of work processes and equipment.
    • Visually ensure works of contractor is carried out safely and efficiently in competent manner and that they adhere to the permit system.
    • Carry out the Technical Integrity role for the instrument engineering on Projects.
    • Capable of preparing reports and prepares studies on instrument facilities and has problem solving abilities.

    Projects involved in DESCON Workshop/Sites:

    Additional POV installation for GPR1, PP1, Borouge-II
    The PP-1 Plant requires additional POV (Product Outlet Vessel) for Gas Phase Reactor (GPR-1) in addition to the existing POV 24-VV-401 due to future planned business requirements. Scope includes engineering, procurement and commissioning of 03 new CVs, 14 XVs and 17 new instruments to be added. 89 new I/O’s to added with the existing automation system, Existing DCS and ESD modifications including new assigned DCS/ESD interlocks.


    Construction of 32 PARCO-PENEX modular package for UOP-Honeywell
    UOP licensed the Penex process?technology to produce isomerate, a cleaner gasoline blend-stock that contains no benzene, aromatics or olefins. P&C based modular package scope includes the procurement and installation/trial fit of 44 control valves, 61 DP transmitters, 40 Pressure Transmitters, 05 Flow transmitters and 05 moisture analyzers.

    Construction of 06 ARAMCO-VRU modular package for JohnZink Hamworthy
    Carbon Adsorption Vapor Recovery Units (VRUs) safely prevent harmful volatile organic compounds (VOCs) from being released into the atmosphere during operations that involve the transfer of evaporative hydrocarbons. Scope includes the installation of 17 control valves, 15 PT’s, 05 Flow Transmitters, 15 Temperature transmitter, and 08 DP transmitter.

    Construction of 07 ADCO modular package for Sirritec Nigi
    The purpose of this project is to fabricate and erection of 07 no. of modular package as a part of Phase III of the Al Dabb’iya field development which is planned to deliver an additional 73 MBOPD. Scope includes the installation of instrumentation and electrification/earthing of the modular package.

    Construction of 12 KOC module for Petrofac
    The purpose of this project is to construct and install the instrumentation on modules for the Kuwait oil company.

Academic Qualification

Bachelor 01 August 2014

Electrical Engineering
Certifications
Recommend Ehtisham ul Haq
Related UserList of Members
Mentor
Not yet Assigned
Profile Answers
Related Professionals
Profession: Instrument & Control System Engineer
Current City: Sydney

Profession: Electrical Engineer
Current City: Dubai

Profession: Mechanical engineer
Current City: 0

Profession:
Current City: Lahore

Profession: HSE officer
Current City: Abu Dhabi

Profession: Engineer
Current City: Abbottabad