1. Preparation of Client invoice (IPC) After vetting IPC to issue sub-contractor payment/invoice
2. Preparation of BOQ as per drawing provided by the consultant submitted for approva
3. After vetting IPC Preparation of RAR (Running Account Receipt) for release sub-contractor payment
4. Preparation of claims, variation order, Deviation order to client for approval
5. Preparation of EOT (Extension of Time) due to design issue from client and Design Consultant.
6. Preparing MOU, LOI, Contracts and pricing Change Orders and negotiating agreement with the Client and Sub-contractor as necessary.
7. Earth work calculation (Road X-Section) (with dongle software)
8. Design of grading plan (for super elevation data)
9. Pre-contract (Rate Analysis in CCS candy software & Excel , Qty takeoff from Tender drawings, Preparation of BOQ) Post-Contract (Milestone achievement, IPC for subcontractors /Vendor /Suppliers, Qty takeoff as per new design, Claims (EOT, Variation order, Deviation order, Escalation), Monthly Progress Report, Budget report
10. Assist colleagues whenever necessary
Experience as Quantity surveyor
National Logistics Cell
01 November 2003
28 January 2010
Development of Infrastructure, Roads & Bridges of Defense Housing Society Islamabad
Position Held: Quantity Surveyor
Client: Defense Housing Authority, DHAI
Consultant: NESPAK
Project Value: Pak Rs. 3500 Million
Location: Rawalpindi, Pakistan
Experience as Quantity surveyor
Al Aberah Elec and mech works
05 February 2010
15 August 2012
Civil works of Laying of OFC, & Oil & Gas Maintenance project
Position Held: Project Engineer/ Quantity Surveyor
Client: UAE Forces
Location: UAE
Experience as Quantity surveyor
National Logistics Cell
01 September 2012
30 August 2014
Metro Bus Project PKG-II, Elevated Portion, 3 x Station & Bridges Rawalpindi
Position Held: Senior Quantity Surveyor
Client: Government of Punjab Rawalpindi Development Authority
Consultant: NESPAK
Project Value: Pak Rs. 1800 Million
Location: Rawalpindi, Pakistan
Experience as Quantity surveyor
Al Fahd Company
05 September 2014
15 February 2016
ROAD & BRIDGE PROJECT IN HEAD OFFICE, SAUDI ARABIA
1. (KING ABDULLAH INTERCHANGE & NORTH ZUGAIBIYAH INTERCHANGE) LENGTH= 25KM
2. QASSIM AIRPORT ROAD: LENGTH = 15 KM
3. Interchange # 1 LENGTH= 22KM
4. Interchange # 2 LENGTH= 20KM
5. Interchange # 4 LENGTH= 45KM
Position Held: Senior Quantity Surveyor
Client: Ministry of Transportation, Al Qassim, KSA
Location: Unaizah, Al Qassim, KSA
Experience as Quantity surveyor
National Logistics Cell
01 March 2016
28 July 2017
Metro Bus Project PKG-IV (4 x Metro Station, 4 x Bridge & Roads), Islamabad - Pakistan
Position Held: Senior Quantity Surveyor
Client: National Highway Authority (NHA)
Consultant: NESPAK
Project Value: Pak Rs. 2283 Million
Location: New International Islamabad Airport, Main link connecting Road, Islamabad
Experience as Quantity Surveyor
REDCO International, Trading and Contracting, Wll, Qatar
08 August 2017
03 August 2019
Design & Build of HIA Red Line Qatar Rail Project, Metro Station, Bridge & Shelter, Doha – Qatar
Project Held: Senior Quantity Surveyor
Client – Qatar Rail
Consultant – PMC (JACOBS)
Project Value: QAR: 229 Million
Location: Hamad International Airport Metro Rail Station, Shalter & Bridge, Doha, Qatar
Matric 12 May 1997
Secondary school certificate - 1st divisionMatric 01 November 2003
Diploma of Associate Engineering in Civil Technology - 3 Years Grade : B (58%)Bachelor 10 April 2007
Bachelor of Technology in Civil Engineering - 2 Years GPA : 3.15/4